Opportunity
Renewable Water Resources Planetbids #612
Mauldin Road WRRF Dewatering Equipment and Controls Upgrade
Posted
November 25, 2026
Respond By
January 11, 2027
Identifier
612
NAICS
237110
Renewable Water Resources is seeking construction and controls-integration work to upgrade dewatering equipment at its Mauldin Road water resource recovery facility in Greenville, South Carolina. - Government buyer: Renewable Water Resources (ReWa), Purchasing; Greenville, South Carolina. - Scope: Replace belt filter presses and related equipment, install three centrifuges and three centrifuge feed pumps, replace pumps, conveyors and polymer equipment, and convert two existing DAF tanks into a sludge storage tank and a centrate equalization tank. - Named OEMs and products: Alfa Laval Aldec 72 G3 centrifuges; Emerson PLC and VersaPoint I/O equipment; ABB ACS 880 variable-frequency drives; B&R PC2200 remote-support gateway; VEGA VEGAPULS 6X radar level meters; and EXACQ exacqVision Professional camera software. These are named in proposed or allowance materials, not identified as final selections. CITI Inc. is the proposed control-system integrator; Hach WIMS and WIN-911 are existing systems to be configured. - Quantities and controls: Three centrifuges, three centrifuge feed pumps, two digested-sludge transfer-pump control panels, four aging-tank mixer panels, three polymer feed-pump panels, eight network cameras, seven water-service and three chemical-service magnetic flow meters, nine radar meters, 13 capacitive level switches, four float switches, and 16 pressure gauge/switch assemblies. - Additional work: Process and electrical equipment, panels, instrumentation, cabling, system programming and integration, testing, commissioning, startup, and operator training. The controls-integration allowance totals $1,641,451 excluding taxes; this is not stated as the total project value. - Notable requirements and timing: Overall completion is stated as 760 calendar days after notice to proceed. The integrator allowance includes a two-year service warranty; hardware delivery is projected 20–24 weeks after approved submittals. A WP license requirement is stated. Liquidated damages are specified for late completion and building outages.
Description
Renewable Water Resources is seeking bids to replace the existing belt filter presses and associated dewatering equipment. The work includes installing three centrifuges and three centrifuge feed pumps; replacing digester transfer pumps, conveyors, polymer storage and aging tanks, polymer feed pumps, and filtrate pumps; and converting two existing DAF tanks to sludge storage and centrate equalization tanks. The project duration is 760 days, and responses are due January 11, 2027, at 14:00. A mandatory pre-bid meeting is scheduled for December 14, 2026.