# Renewable Water Resources Planetbids #612

Mauldin Road WRRF Dewatering Equipment and Controls Upgrade

**Posted:** November 25, 2026
**Respond By:** January 11, 2027
**Identifier:** 612
**NAICS:** 237110

Renewable Water Resources is seeking construction and controls-integration work to upgrade dewatering equipment at its Mauldin Road water resource recovery facility in Greenville, South Carolina.
- **Government buyer:** Renewable Water Resources (ReWa), Purchasing; Greenville, South Carolina.
- **Scope:** Replace belt filter presses and related equipment, install three centrifuges and three centrifuge feed pumps, replace pumps, conveyors and polymer equipment, and convert two existing DAF tanks into a sludge storage tank and a centrate equalization tank.
- **Named OEMs and products:** **Alfa Laval** Aldec 72 G3 centrifuges; **Emerson** PLC and VersaPoint I/O equipment; **ABB** ACS 880 variable-frequency drives; **B&R** PC2200 remote-support gateway; **VEGA** VEGAPULS 6X radar level meters; and **EXACQ** exacqVision Professional camera software. These are named in proposed or allowance materials, not identified as final selections. **CITI Inc.** is the proposed control-system integrator; Hach WIMS and WIN-911 are existing systems to be configured.
- **Quantities and controls:** Three centrifuges, three centrifuge feed pumps, two digested-sludge transfer-pump control panels, four aging-tank mixer panels, three polymer feed-pump panels, eight network cameras, seven water-service and three chemical-service magnetic flow meters, nine radar meters, 13 capacitive level switches, four float switches, and 16 pressure gauge/switch assemblies.
- **Additional work:** Process and electrical equipment, panels, instrumentation, cabling, system programming and integration, testing, commissioning, startup, and operator training. The controls-integration allowance totals $1,641,451 excluding taxes; this is not stated as the total project value.
- **Notable requirements and timing:** Overall completion is stated as 760 calendar days after notice to proceed. The integrator allowance includes a two-year service warranty; hardware delivery is projected 20–24 weeks after approved submittals. A WP license requirement is stated. Liquidated damages are specified for late completion and building outages.

### Description

Renewable Water Resources is seeking bids to replace the existing belt filter presses and associated dewatering equipment. The work includes installing three centrifuges and three centrifuge feed pumps; replacing digester transfer pumps, conveyors, polymer storage and aging tanks, polymer feed pumps, and filtrate pumps; and converting two existing DAF tanks to sludge storage and centrate equalization tanks. The project duration is 760 days, and responses are due January 11, 2027, at 14:00. A mandatory pre-bid meeting is scheduled for December 14, 2026.

[View original listing](https://vendors.planetbids.com/portal/42823/bo/bo-detail/148679)