Opportunity

Palos Verdes Estates Planet bids #PROJECT NO. 8725 (Bioretention Systems)

Install Two Bioretention Systems on Peninsula Verde

Posted

November 25, 2026

Respond By

January 16, 2027

Identifier

PROJECT NO. 8725 (Bioretention Systems)

NAICS

237990, 237110

The City of Rancho Palos Verdes Public Works Department is soliciting bids for Project No. 8725 to install two bioretention systems on Peninsula Verde. - Buyer: City of Rancho Palos Verdes, Public Works Department, Rancho Palos Verdes, Los Angeles County, California. - Scope: Furnish labor, materials, and equipment to install two stormwater systems that divert runoff from a 26.6-acre tributary area before it reaches Machado Lake. The systems are designed for 24-hour retention capacity of 0.05 acre-feet. - Products and materials: 30 linear feet of 8-inch perforated PVC pipe and fittings; 10 cubic yards of 3/4-inch gravel; 350 square feet of filter fabric; two catch basins; 5 cubic yards of bioretention soil media; 1 cubic yard each of wood mulch and splash rock; and two 8-inch cleanouts. - Installation and related work: Mobilization, traffic control, BMP and erosion control, utility verification and potholing, shoring, 165 linear feet of 8-inch PVC pipe installation, 2 cubic yards of sidewalk replacement, two pipe connections, 85 square feet of planting, and two catch basin stencils. - Standards and requirements: Catch basins reference SPPWC 302-4; pipe connections reference SPPWC 335-2. License requirements are specified in the bid proposal. Liquidated damages are $1,000 per day. - OEMs and vendors: No OEMs, manufacturers, or vendors are identified by name.

Description

The project involves furnishing labor, materials, equipment, and incidental work to install two bioretention systems on Peninsula Verde. The systems will divert stormwater and urban runoff from a 26.6-acre tributary area before it flows to Machado Lake in Harbor City. They will provide 24-hour retention capacity of 0.05 ac-ft to address water quality needs. The work is described further in the Contract Documents and has a duration of 45 working days.

View original listing