Opportunity
North Carolina eVP #148-MAINT-058
Asheville High School Varsity Gym Curtain Wall and Door Replacement
Posted
November 24, 2026
Respond By
December 11, 2026
Identifier
148-MAINT-058
NAICS
332321, 238150
Asheville City Schools is seeking a contractor to replace the curtain wall and door assemblies at Asheville High School’s varsity gym. - Buyer: Asheville City Schools, State of North Carolina; Asheville, Buncombe County. - Scope: Furnish and install one aluminum curtain wall system, approximately 12 inches deep, with a deep face cap and black Kynar finish, plus four pairs of wide-stile aluminum doors, each pair approximately six feet wide. - Door hardware: Four sets each of continuous hinges, Von Duprin rim panic exit devices, removable mullions, LCN 4040 XP surface-mounted closers, and BEST cylinder housings for owner-provided lock cores. - OEMs/brands: Von Duprin, LCN, and BEST are named for hardware; Kynar is specified as the finish. No curtain-wall or door-system manufacturer is specified, and no part numbers are provided except LCN 4040 XP. - Installation requirements: Verify dimensions and site conditions before fabrication; furnish required framing, anchors, seals, fasteners, sealants, and accessories; coordinate work with the school; and adjust and test the installed doors and hardware. - Exclusions and warranty: Demolition and removal of existing frames, lock cores, and keying are excluded. Provide applicable manufacturer warranties and at least a one-year workmanship warranty.
Description
Asheville City Schools is seeking proposals to furnish and install a new aluminum curtain wall system and associated door assemblies at the Asheville High School Varsity Gym Building. The work includes a curtain wall system, four pairs of wide-stile aluminum doors, required framing and accessories, and specified commercial-grade door hardware. Contractors must field-verify dimensions, schedule a mandatory site visit, and include pricing, qualifications, project examples, estimated timeline, and applicable warranties in their proposals. Existing-frame demolition and removal, BEST lock cores, and lock keying are excluded from the contractor’s scope.