Opportunity
Nevada Ionwave #IFB-27-0940
CSN Collegewide Electronic-Access Installation and Integration
Posted
November 14, 2026
Respond By
December 15, 2026
Identifier
IFB-27-0940
NAICS
238210, 561621
The College of Southern Nevada (CSN) is seeking a turnkey, collegewide electronic-access upgrade across campuses in Henderson, North Las Vegas, and Las Vegas. - Buyer: Nevada System of Higher Education Board of Regents, on behalf of CSN; procurement and project offices include Business Center South and CSN Facilities Management. - Scope: Install electronic access at exterior and classroom doors without existing access. Work includes door hardware, access-control panels, readers, cabling, electrical and low-voltage infrastructure, integration, testing, training, and closeout. - Locations: Henderson Campus and Green Valley Tech Center; Summerlin Center, West Charleston Campus Building C, and Sahara West Center; and North Las Vegas Campus buildings A, C, M-E, M-H, M-N, M-S, and Modular Buildings 1, 7, and 8. - Specified OEMs and products: HID Signo 40 Series readers; Mercury MP controllers; Life Safety Power E6M1 enclosures; Securitron DPS-W door-position switches and AQD power supplies; ASSA ABLOY ACCENTRA and TRIMEC electric strikes and INCEDO reader; and Genetec Security Center SaaS, with a five-year license. Quantities for most hardware are not specified; the plans call for one-inch EMT homeruns with specified combination cable, and include a 4 ft. x 8 ft. fire-rated backboard at a designated location. - Other requirements: Contractor must field-verify existing conditions, reuse suitable wiring and raceways, provide new infrastructure where needed, integrate with existing access-control systems, and coordinate work to maintain campus operations, safety, and egress. Provide functional testing, labeling, startup, training, operating documentation, and as-builts. - Schedule and commercial terms: Complete within 180 calendar days after the Notice to Proceed. A 12-month warranty is required; liquidated damages are $1,000 per day for late completion. Estimated project cost is $1,000,000. A mandatory multi-site walk-through is required, and appropriate Nevada contractor licensing applies. - Bid schedule: Bidders must allocate base turnkey costs across construction schedule-of-values categories, including general conditions, demolition, doors and hardware, electrical, low voltage, HVAC, plumbing, and closeout. No additional OEMs or named contractors are identified.
Description
The College of Southern Nevada (CSN) is seeking bids for a collegewide E-Access project. The turnkey construction project will provide electronic access to exterior doors and classroom doors that do not currently have e-access at specified campuses. The contractor is responsible for providing labor, materials, equipment, permits, and required project coordination; the anticipated completion period is 180 days from the notice to proceed. A mandatory site walk is scheduled, and the bid document states an estimated project cost of $1,000,000.