# Nevada Ionwave #IFB-27-0940

CSN Collegewide Electronic-Access Installation and Integration

**Posted:** November 14, 2026
**Respond By:** December 15, 2026
**Identifier:** IFB-27-0940
**NAICS:** 238210, 561621

The College of Southern Nevada (CSN) is seeking a turnkey, collegewide electronic-access upgrade across campuses in Henderson, North Las Vegas, and Las Vegas.
- **Buyer:** Nevada System of Higher Education Board of Regents, on behalf of CSN; procurement and project offices include Business Center South and CSN Facilities Management.
- **Scope:** Install electronic access at exterior and classroom doors without existing access. Work includes door hardware, access-control panels, readers, cabling, electrical and low-voltage infrastructure, integration, testing, training, and closeout.
- **Locations:** Henderson Campus and Green Valley Tech Center; Summerlin Center, West Charleston Campus Building C, and Sahara West Center; and North Las Vegas Campus buildings A, C, M-E, M-H, M-N, M-S, and Modular Buildings 1, 7, and 8.
- **Specified OEMs and products:** **HID Signo 40 Series** readers; **Mercury MP** controllers; **Life Safety Power E6M1** enclosures; **Securitron DPS-W** door-position switches and AQD power supplies; **ASSA ABLOY ACCENTRA** and TRIMEC electric strikes and INCEDO reader; and **Genetec Security Center SaaS**, with a five-year license. Quantities for most hardware are not specified; the plans call for one-inch EMT homeruns with specified combination cable, and include a 4 ft. x 8 ft. fire-rated backboard at a designated location.
- **Other requirements:** Contractor must field-verify existing conditions, reuse suitable wiring and raceways, provide new infrastructure where needed, integrate with existing access-control systems, and coordinate work to maintain campus operations, safety, and egress. Provide functional testing, labeling, startup, training, operating documentation, and as-builts.
- **Schedule and commercial terms:** Complete within 180 calendar days after the Notice to Proceed. A 12-month warranty is required; liquidated damages are $1,000 per day for late completion. Estimated project cost is $1,000,000. A mandatory multi-site walk-through is required, and appropriate Nevada contractor licensing applies.
- **Bid schedule:** Bidders must allocate base turnkey costs across construction schedule-of-values categories, including general conditions, demolition, doors and hardware, electrical, low voltage, HVAC, plumbing, and closeout. No additional OEMs or named contractors are identified.

### Description

The College of Southern Nevada (CSN) is seeking bids for a collegewide E-Access project. The turnkey construction project will provide electronic access to exterior doors and classroom doors that do not currently have e-access at specified campuses. The contractor is responsible for providing labor, materials, equipment, permits, and required project coordination; the anticipated completion period is 180 days from the notice to proceed. A mandatory site walk is scheduled, and the bid document states an estimated project cost of $1,000,000.