Opportunity

City of Columbia Ionwave #104/2026

Turnkey Rebuild of Fire Station #05 and Construction of Fire Station #10

Posted

November 19, 2026

Respond By

December 18, 2026

Identifier

104/2026

NAICS

236220, 238210

The City of Columbia is seeking a general contractor for a turnkey project to rebuild Fire Station #05 and construct Fire Station #10. - Buyer: City of Columbia, Missouri, through its Finance Department Purchasing Division, for the Fire Department and Public Works Department; the City’s Information Technology Department also provides project cabling requirements. - Scope: Demolition and construction of both stations, associated site and utility work, and architectural, structural, civil, mechanical, electrical, plumbing, fire-protection, landscaping, and commissioning work. Station #05 is specified at 1400 Ballenger Lane; Station #10 is at 1100 El Chaparral Avenue S. - Named OEMs and manufacturers: Cummins, Plymovent, Circul-Aire, Speed Queen, Knox, Myers, Locution, AtlasIED, Quam, Schneider Electric, LenelS2, Altronix, Mako, Reelcraft, Leviton, Berk-Tek, Chatsworth Products Inc. (CPI), APC, and Motorola. The Motorola access points are City-provided; other products and equipment have varying contractor-supply or owner-provided requirements. - Identified equipment includes a Cummins C150N6 150 kW generator (1); Plymovent SAF-3110 exhaust fan and MRP55-1 exhaust rail system (1 each); Locution EZ-Zone LCPN33-EZ alerting system (1); Schneider Electric EcoStruxure building automation system (1); and specified appliances, storm-shelter equipment, security equipment, reels, and structured-cabling components. Many cabling quantities are project-dependent or not stated. - Notable requirements include ground-source well-field work with a test bore and specified casing allowances; fire alarm and sprinkler deferred submittals; commissioning; geotechnical mitigation; a 50% construction-waste diversion target; and sustainability measures for recycled or regional materials and low-emitting products. - The proposal calls for a collective fixed-price bid, separate cost breakdowns for each station, and unit prices for specified earthwork and geothermal items. Bid security of at least 5%, performance and payment bonds, applicable Missouri prevailing wages, and liquidated damages of $200 per calendar day for delay are specified. - The contractor must install and certify structured cabling to applicable standards, including all installed cables; provide at least four telecommunications outlets per work area; and install City-provided Motorola AP-650 access points and associated cabling.

Description

The City of Columbia, Missouri is requesting competitive sealed proposals to remove and rebuild Fire Station #05 and construct a new Fire Station #10. The work is for the City’s Fire and Public Works Departments. Proposals may be submitted electronically through the City’s e-bidding website or as sealed hard copies delivered to the Purchasing Division by the stated deadline. The RFP includes project manuals and drawings, bonding requirements, wage information, and other attachments.

View original listing