The City of Columbia is seeking a general contractor for a turnkey project to rebuild Fire Station #05 and construct Fire Station #10.
- Buyer: City of Columbia, Missouri, through its Finance Department Purchasing Division, for the Fire Department and Public Works Department; the City’s Information Technology Department also provides project cabling requirements.
- Scope: Demolition and construction of both stations, associated site and utility work, and architectural, structural, civil, mechanical, electrical, plumbing, fire-protection, landscaping, and commissioning work. Station #05 is specified at 1400 Ballenger Lane; Station #10 is at 1100 El Chaparral Avenue S.
- **Named OEMs and manufacturers:** Cummins, Plymovent, Circul-Aire, Speed Queen, Knox, Myers, Locution, AtlasIED, Quam, Schneider Electric, LenelS2, Altronix, Mako, Reelcraft, Leviton, Berk-Tek, Chatsworth Products Inc. (CPI), APC, and Motorola. The Motorola access points are City-provided; other products and equipment have varying contractor-supply or owner-provided requirements.
- Identified equipment includes a Cummins C150N6 150 kW generator (1); Plymovent SAF-3110 exhaust fan and MRP55-1 exhaust rail system (1 each); Locution EZ-Zone LCPN33-EZ alerting system (1); Schneider Electric EcoStruxure building automation system (1); and specified appliances, storm-shelter equipment, security equipment, reels, and structured-cabling components. Many cabling quantities are project-dependent or not stated.
- Notable requirements include ground-source well-field work with a test bore and specified casing allowances; fire alarm and sprinkler deferred submittals; commissioning; geotechnical mitigation; a 50% construction-waste diversion target; and sustainability measures for recycled or regional materials and low-emitting products.
- The proposal calls for a collective fixed-price bid, separate cost breakdowns for each station, and unit prices for specified earthwork and geothermal items. Bid security of at least 5%, performance and payment bonds, applicable Missouri prevailing wages, and liquidated damages of $200 per calendar day for delay are specified.
- The contractor must install and certify structured cabling to applicable standards, including all installed cables; provide at least four telecommunications outlets per work area; and install City-provided Motorola AP-650 access points and associated cabling.

### Description

The City of Columbia, Missouri is requesting competitive sealed proposals to remove and rebuild Fire Station #05 and construct a new Fire Station #10. The work is for the City’s Fire and Public Works Departments. Proposals may be submitted electronically through the City’s e-bidding website or as sealed hard copies delivered to the Purchasing Division by the stated deadline. The RFP includes project manuals and drawings, bonding requirements, wage information, and other attachments.