Opportunity
SAM #6973GH-27-R-00042
FAA QNA ARSR Building and Exterior Water-Intrusion Repairs
Buyer
Federal Aviation Administration
Posted
November 20, 2026
Respond By
December 23, 2026
Identifier
6973GH-27-R-00042
NAICS
236220
The FAA is seeking a contractor to repair water-damaged building and exterior components at the QNA ARSR facility in Morales, Texas. - Government buyer - Federal Aviation Administration (FAA), U.S. Department of Transportation; solicitation 6973GH-27-R-00042, with procurement references to 6973GH Franchise Acquisition Services and AAQ-710 Logistics Center Acquisition at the FAA Aeronautical Center. Edward B. Wright is named in the solicitation. - Technical offices identified in the attachments are FAA Central Service Area, Engineering Services (AJW-2C18D), and Engineering Services (AJW-2C18D). - Scope of work - Repair building and exterior items, correct water damage, and prevent water intrusion at the QNA ARSR site. Work includes cleaning, sealing, water-repellent application, repairs and painting, door and hardware upgrades, ceiling and flooring replacement, and exhaust fan work. - Replace two gable attic exhaust fans and one UPS Room wall fan; provide compatible controls, housings and weatherhoods. Replace Equipment Room exterior doors and frames, plus specified hardware and finishes. - Provide labor, materials, equipment, testing, cleanup, warranties, site support, and a portable toilet while construction personnel are present. - Named OEMs and vendors - Greenheck, Johnson Controls, Armstrong, Foundation Armor, DAP, and Sika are named for fans, controls, flooring, water repellent, wood filler, and sealant. - Door-hardware schedule manufacturers include IVE, VON, BES, LCN, ZER, and GLY. Bollard covers are specified by Bollards and Sleeves, LLC. A GSA-certified locksmith is required, but no company is named. - Key products, part numbers, and quantities - Two Greenheck attic fans (SE1-16-428A5X-QD; alternate formatting appears in the specifications), two H-16 wall housings, two WTHD-16-90 weatherhoods, and one WTHD-18-90 weatherhood. Exact sizes and models require field verification. - One UPS Room exhaust fan, reference Greenheck CW-099A/CW099A; field-verify the existing make and model. Johnson Controls fan speed control P266ACA-100C (item 40G352); fans are set to operate above 90°F and stop below 90°F. - Armstrong Standard Excelon Imperial VCT, SKU 51839, Fortress White, 12 × 12 inches, or approved equivalent; quantity depends on field conditions. Foundation Armor SX5000 water repellent, DAP 3 in 1 Premium Wood Filler (item 101513), and Sika WS-295 sealant are also specified. - Replace the front double and rear single Equipment Room exterior doors and frames with 14-gauge, Label B fire-rated units. Specifications also call for gasketing at eight door frames and sweeps on eight door leaves. Approximately 24 yellow bollard covers are required, subject to field verification. - The door-hardware schedule includes hinges (5BB1HW 4.5 × 4.5 NRP, quantity 3; 5BB1 4.5 × 4.5 NRP, quantity 6), panic hardware (CD-99-NL, 1), rim cylinder (1E-72, 1), mortise cylinder (1E-74, 1), SFIC cores (3), surface closers (4040XP SCUSH TBSRT, 2), plates (8400 10 × 2 LDW B-CS, 4; 8200 4 × 16, 1; 8303 10-inch, 4 × 16, 1), gasketing (328A, 1; 188S H & J, 2), sweeps (39A, 3 in the hardware schedule), thresholds (655A, 2), floor stops (WS406/407CCV, 2), construction latching bolt (FB51P, 1), dust-proof strike (DP1, 1), overhead stop (90S, 1), door bottom (369AA, 1), and one astragal. The wider specifications separately require eight sweeps. - Notable requirements - Keep Equipment Room operations functional, protect FAA/ARSR equipment from dust, and avoid service interruptions. Field-verify existing conditions and coordinate door keying with the owner. - A GSA-certified locksmith must remove and reinstall the existing CDX-10 lock and Hoffman box at the main entrance; the contractor coordinates and pays for this work. Asbestos-containing materials are prohibited, and bonds are required. - Work must begin within 45 calendar days after notice to proceed; the completion date and overall duration are not specified in the supplied information. No total contract value is provided; an attachment estimates a $15,000 cost impact for an engineering change.
Description
Contractor shall provide all plant, labor, materials and equipment necessary to fully meet all requirements of this Summary of Work, Construction Specifications, Construction Drawings and all other Contract Documents related to and/or titled: JCN 1703883. QNA ARSR. Repair Building and Exterior Items, Correct Water Damage and Prevent Water Intrusion, Morales (Hallettsville) TX.
Project Identification: JCN 1703883 QNA ARSR Repair Building & Exterior Items, Correct Water Damage, Prevent Water Intrusion, Morales TX. a. Project Location: about 12 miles south of Hallettsville TX. b. Access road through 2nd gate on left pass bridge off CR-12. c. Coordinates are 29°20'28.71"N, 96°52'19.69"W or 29.341420, -96.871910