# SAM #6973GH-27-R-00042

FAA QNA ARSR Building and Exterior Water-Intrusion Repairs

**Buyer:** Federal Aviation Administration
**Posted:** November 20, 2026
**Respond By:** December 23, 2026
**Identifier:** 6973GH-27-R-00042
**NAICS:** 236220

The FAA is seeking a contractor to repair water-damaged building and exterior components at the QNA ARSR facility in Morales, Texas.
- **Government buyer**
  - Federal Aviation Administration (FAA), U.S. Department of Transportation; solicitation 6973GH-27-R-00042, with procurement references to 6973GH Franchise Acquisition Services and AAQ-710 Logistics Center Acquisition at the FAA Aeronautical Center. Edward B. Wright is named in the solicitation.
  - Technical offices identified in the attachments are FAA Central Service Area, Engineering Services (AJW-2C18D), and Engineering Services (AJW-2C18D).
- **Scope of work**
  - Repair building and exterior items, correct water damage, and prevent water intrusion at the QNA ARSR site. Work includes cleaning, sealing, water-repellent application, repairs and painting, door and hardware upgrades, ceiling and flooring replacement, and exhaust fan work.
  - Replace two gable attic exhaust fans and one UPS Room wall fan; provide compatible controls, housings and weatherhoods. Replace Equipment Room exterior doors and frames, plus specified hardware and finishes.
  - Provide labor, materials, equipment, testing, cleanup, warranties, site support, and a portable toilet while construction personnel are present.
- **Named OEMs and vendors**
  - **Greenheck**, **Johnson Controls**, **Armstrong**, **Foundation Armor**, **DAP**, and **Sika** are named for fans, controls, flooring, water repellent, wood filler, and sealant.
  - Door-hardware schedule manufacturers include **IVE**, **VON**, **BES**, **LCN**, **ZER**, and **GLY**. Bollard covers are specified by **Bollards and Sleeves, LLC.** A GSA-certified locksmith is required, but no company is named.
- **Key products, part numbers, and quantities**
  - Two Greenheck attic fans (SE1-16-428A5X-QD; alternate formatting appears in the specifications), two H-16 wall housings, two WTHD-16-90 weatherhoods, and one WTHD-18-90 weatherhood. Exact sizes and models require field verification.
  - One UPS Room exhaust fan, reference Greenheck CW-099A/CW099A; field-verify the existing make and model. Johnson Controls fan speed control P266ACA-100C (item 40G352); fans are set to operate above 90°F and stop below 90°F.
  - Armstrong Standard Excelon Imperial VCT, SKU 51839, Fortress White, 12 × 12 inches, or approved equivalent; quantity depends on field conditions. Foundation Armor SX5000 water repellent, DAP 3 in 1 Premium Wood Filler (item 101513), and Sika WS-295 sealant are also specified.
  - Replace the front double and rear single Equipment Room exterior doors and frames with 14-gauge, Label B fire-rated units. Specifications also call for gasketing at eight door frames and sweeps on eight door leaves. Approximately 24 yellow bollard covers are required, subject to field verification.
  - The door-hardware schedule includes hinges (5BB1HW 4.5 × 4.5 NRP, quantity 3; 5BB1 4.5 × 4.5 NRP, quantity 6), panic hardware (CD-99-NL, 1), rim cylinder (1E-72, 1), mortise cylinder (1E-74, 1), SFIC cores (3), surface closers (4040XP SCUSH TBSRT, 2), plates (8400 10 × 2 LDW B-CS, 4; 8200 4 × 16, 1; 8303 10-inch, 4 × 16, 1), gasketing (328A, 1; 188S H & J, 2), sweeps (39A, 3 in the hardware schedule), thresholds (655A, 2), floor stops (WS406/407CCV, 2), construction latching bolt (FB51P, 1), dust-proof strike (DP1, 1), overhead stop (90S, 1), door bottom (369AA, 1), and one astragal. The wider specifications separately require eight sweeps.
- **Notable requirements**
  - Keep Equipment Room operations functional, protect FAA/ARSR equipment from dust, and avoid service interruptions. Field-verify existing conditions and coordinate door keying with the owner.
  - A GSA-certified locksmith must remove and reinstall the existing CDX-10 lock and Hoffman box at the main entrance; the contractor coordinates and pays for this work. Asbestos-containing materials are prohibited, and bonds are required.
  - Work must begin within 45 calendar days after notice to proceed; the completion date and overall duration are not specified in the supplied information. No total contract value is provided; an attachment estimates a $15,000 cost impact for an engineering change.

### Description

<p>Contractor shall provide all plant, labor, materials and equipment necessary to fully meet all<br />
requirements of this Summary of Work, Construction Specifications, Construction Drawings and<br />
all other Contract Documents related to and/or titled: JCN 1703883. QNA ARSR. Repair Building<br />
and Exterior Items, Correct Water Damage and Prevent Water Intrusion, Morales (Hallettsville)<br />
TX.&nbsp;</p>

<p>Project Identification: JCN 1703883 QNA ARSR Repair Building &amp; Exterior Items, Correct Water<br />
Damage, Prevent Water Intrusion, Morales TX.<br />
a. Project Location: about 12 miles south of Hallettsville TX.<br />
b. Access road through 2nd gate on left pass bridge off CR-12.<br />
c. Coordinates are 29&deg;20&#39;28.71&quot;N, 96&deg;52&#39;19.69&quot;W or 29.341420, -96.871910</p>

[View original listing](https://sam.gov/opp/fc5744b841bd4187a6a5d9e3e270e6c7/view)