Opportunity
SAM #1240LP27Q0002
USDA Forest Service Request for an 85-Foot FRP Trail Bridge
Buyer
USFS Intermountain Region CSA 4
Posted
November 18, 2026
Respond By
December 07, 2026
Identifier
1240LP27Q0002
NAICS
326199
The USDA Forest Service is seeking a complete engineered bridge system for the Elkhorn Trail crossing of the Little Snake River in Colorado. - Government buyer: U.S. Department of Agriculture (USDA), Forest Service; Medicine Bow-Routt National Forests & Thunder Basin National Grassland; Hahns Peak/Bears Ears Ranger District. The Rocky Mountain Region and Medicine Bow-Routt National Forest are also identified in supporting plans. - Main procurement: Design, fabricate, and deliver one 85-foot, single-span, 5-foot-clear-width prefabricated FRP side-truss trail bridge. The Forest Service will install it. - OEMs and vendors: No OEMs, manufacturers, or vendors are named in the opportunity. - Bridge requirements: Include Colorado-licensed professional engineer-stamped design drawings and calculations, subject to Forest Service engineering approval before fabrication; FRP grade beams, bearings, railings, decking, treated timber running-plank surface, hardware, and all other components for a complete system. The bridge must serve pedestrian, bicycle, ATV, and pack-and-saddle traffic, carry a minimum 15-year warranty, and be delivered unloaded at the Columbine Parking Area. Delivery logistics must account for helicopter transport or required ground-transport permits. - Other items listed in supporting plans: One trail-bridge substructure and 500 square feet of Class 1 riprap surfacing. Plans also list construction-related work, including mobilization, excavation, borrow, trail restoration, drainage removal, clearing and grubbing, aggregate approaches, optional helicopter transport, seeding, and erosion control. These plan items may describe broader project construction; the bridge order states that Forest Service installation is not included. - Notable specification difference: Supporting plans describe an FRP-or-steel bridge alternative and a minimum 60-inch clear width; the bridge order and statement of work specify an FRP bridge with 5-foot clear width.
Description
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotes are being requested and a separate written solicitation will not be issued. Solicitation number 1240LP27Q0002 is issued as a Request for Quotation (RFQ) for the design, fabrication, and delivery of one (1) 85-foot single-span prefabricated fiber-reinforced polymer (FRP) trail bridge for the Elkhorn Trail crossing of the Little Snake River, Hahns Peak/Bears Ears Ranger District, Medicine Bow-Routt National Forests & Thunder Basin National Grassland, near Hahns Peak Village, Colorado, for installation by the Forest Service. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification System (NAICS) code is 326199 – All Other Plastics Product Manufacturing. The small business size standard is 750 employees. This acquisition is a Total Small Business Set-Aside. All responsible small business sources may submit a quotation which will be considered by the agency. Delivery of bridge required between May 15th, 2027 and June 30th, 2027. Read quote submission instructions carefully to ensure you submit all the required documentation for your quotation. Submit Questions to Westley.Bisson@usda.gov by 11/30/2026 at 1600 (MT) Submit Quotations to Westley.Bisson@usda.gov by 12/7/2026 at 1600 (MT)