# SAM #1240LP27Q0002

USDA Forest Service Request for an 85-Foot FRP Trail Bridge

**Buyer:** USFS Intermountain Region CSA 4
**Posted:** November 18, 2026
**Respond By:** December 07, 2026
**Identifier:** 1240LP27Q0002
**NAICS:** 326199

The USDA Forest Service is seeking a complete engineered bridge system for the Elkhorn Trail crossing of the Little Snake River in Colorado.
- **Government buyer:** U.S. Department of Agriculture (USDA), Forest Service; Medicine Bow-Routt National Forests & Thunder Basin National Grassland; Hahns Peak/Bears Ears Ranger District. The Rocky Mountain Region and Medicine Bow-Routt National Forest are also identified in supporting plans.
- **Main procurement:** Design, fabricate, and deliver one 85-foot, single-span, 5-foot-clear-width prefabricated FRP side-truss trail bridge. The Forest Service will install it.
- **OEMs and vendors:** No OEMs, manufacturers, or vendors are named in the opportunity.
- **Bridge requirements:** Include Colorado-licensed professional engineer-stamped design drawings and calculations, subject to Forest Service engineering approval before fabrication; FRP grade beams, bearings, railings, decking, treated timber running-plank surface, hardware, and all other components for a complete system. The bridge must serve pedestrian, bicycle, ATV, and pack-and-saddle traffic, carry a minimum 15-year warranty, and be delivered unloaded at the Columbine Parking Area. Delivery logistics must account for helicopter transport or required ground-transport permits.
- **Other items listed in supporting plans:** One trail-bridge substructure and 500 square feet of Class 1 riprap surfacing. Plans also list construction-related work, including mobilization, excavation, borrow, trail restoration, drainage removal, clearing and grubbing, aggregate approaches, optional helicopter transport, seeding, and erosion control. These plan items may describe broader project construction; the bridge order states that Forest Service installation is not included.
- **Notable specification difference:** Supporting plans describe an FRP-or-steel bridge alternative and a minimum 60-inch clear width; the bridge order and statement of work specify an FRP bridge with 5-foot clear width.

### Description

<p>This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotes are being requested and a separate written solicitation will not be issued.<br />
<br />
Solicitation number 1240LP27Q0002 is issued as a Request for Quotation (RFQ) for the design, fabrication, and delivery of one (1) 85-foot single-span prefabricated fiber-reinforced polymer (FRP) trail bridge for the Elkhorn Trail crossing of the Little Snake River, Hahns Peak/Bears Ears Ranger District, Medicine Bow-Routt National Forests &amp; Thunder Basin National Grassland, near Hahns Peak Village, Colorado, for installation by the Forest Service.<br />
<br />
This acquisition is set-aside for small business concerns. The applicable North American Industry Classification System (NAICS) code is 326199 &ndash; All Other Plastics Product Manufacturing. The small business size standard is 750 employees. This acquisition is a Total Small Business Set-Aside. All responsible small business sources may submit a quotation which will be considered by the agency.<br />
<br />
<u><strong>Delivery of bridge required between May 15th, 2027 and June 30th, 2027.</strong></u><br />
<br />
<u><strong>Read quote submission instructions carefully to ensure you submit all the required documentation for your quotation.</strong></u><br />
<br />
Submit Questions to Westley.Bisson@usda.gov by 11/30/2026 at 1600 (MT)<br />
Submit Quotations to Westley.Bisson@usda.gov by 12/7/2026 at 1600 (MT)</p>

[View original listing](https://sam.gov/opp/61383fe8c264412bb97c38e2310c37ca/view)
