Opportunity

Johnson County Ionwave #2026-045 Addendum 2

Progressive design-build services for Brush Creek Pump Station replacement and improvements

Posted

November 04, 2026

Respond By

December 09, 2026

Identifier

2026-045 Addendum 2

NAICS

237110, 237990

Johnson County Wastewater is seeking a progressive design-build team to replace and improve the Brush Creek Pump Station in Prairie Village, Kansas. - Government buyer: Johnson County, Kansas, through Johnson County Wastewater (JCW), Department of Financial Management and Administration, Purchasing Division. - Opportunity: Brush Creek Pump Station Improvements Project, Contract MTM1-C080 (RFQ 2026-045). Phase 1 covers preconstruction and design; final design and construction are conditional Phase 2 services. - Scope: Replace the aging pump station with a facility designed for future wet-weather flows. Initial capacity is approximately 5.5 million gallons per day (mgd), with potential future expansion to 20 mgd; initial equipment is sized for current flows. - Equipment identified in project planning: 3 pumps rated at 2.5 mgd and 100 hp each; 2 screens; 2 washer compactors; 1 sluice; 4 gates; 4 stop logs; 1 2,000-gallon Bioxide tank; 2 chemical feed pumps; 1 carbon scrubber and fan; 2 variable frequency drives (VFDs); 1 low-voltage panel and transformer; 1 HVAC unit and ductwork; and 1 20-inch magnetic flow meter. A future configuration also anticipates five 5-mgd pumps, four firm-duty; final design may determine the equipment configuration. - Other project elements: Screenings handling, odor control, electrical facilities, creek access, site and conveyance improvements, and easements. - Notable requirements: Maintain wastewater operations during the work; address code, reliability, and safety concerns; manage hazardous materials during demolition; limit neighborhood and park disruption; coordinate with Prairie Village and the community; and restore Porter Park’s baseball field. - Commercial context: Estimated project cost is $12–17 million, including engineering, easements, land acquisition, and construction. The planning estimate is approximately $13.1 million with escalation. Construction is contingent on County approval and agreement on an acceptable price and schedule. - OEMs and vendors: No equipment manufacturers, OEMs, or prospective vendors are named; products are specified by type and capacity rather than brand or part number.

Description

Johnson County Wastewater (JCW) is seeking statements of qualifications from Design-Build teams for preconstruction and design services, with the option of construction services, for the Brush Creek Pump Station Improvements Project (Contract No. MTM1-C080). The procurement has three phases: qualifications and shortlisting, proposals from shortlisted firms, and interviews. The project addresses aging pump station assets and facility needs, including code compliance and future wet-weather flows. The RFQ states an estimated total project cost of $12–$17 million, including engineering, easements, land acquisitions, and construction.

View original listing