# Johnson County Ionwave #2026-045 Addendum 2

Progressive design-build services for Brush Creek Pump Station replacement and improvements

**Posted:** November 04, 2026
**Respond By:** December 09, 2026
**Identifier:** 2026-045 Addendum 2
**NAICS:** 237110, 237990

Johnson County Wastewater is seeking a progressive design-build team to replace and improve the Brush Creek Pump Station in Prairie Village, Kansas.
- **Government buyer:** Johnson County, Kansas, through Johnson County Wastewater (JCW), Department of Financial Management and Administration, Purchasing Division.
- **Opportunity:** Brush Creek Pump Station Improvements Project, Contract MTM1-C080 (RFQ 2026-045). Phase 1 covers preconstruction and design; final design and construction are conditional Phase 2 services.
- **Scope:** Replace the aging pump station with a facility designed for future wet-weather flows. Initial capacity is approximately 5.5 million gallons per day (mgd), with potential future expansion to 20 mgd; initial equipment is sized for current flows.
- **Equipment identified in project planning:** 3 pumps rated at 2.5 mgd and 100 hp each; 2 screens; 2 washer compactors; 1 sluice; 4 gates; 4 stop logs; 1 2,000-gallon Bioxide tank; 2 chemical feed pumps; 1 carbon scrubber and fan; 2 variable frequency drives (VFDs); 1 low-voltage panel and transformer; 1 HVAC unit and ductwork; and 1 20-inch magnetic flow meter. A future configuration also anticipates five 5-mgd pumps, four firm-duty; final design may determine the equipment configuration.
- **Other project elements:** Screenings handling, odor control, electrical facilities, creek access, site and conveyance improvements, and easements.
- **Notable requirements:** Maintain wastewater operations during the work; address code, reliability, and safety concerns; manage hazardous materials during demolition; limit neighborhood and park disruption; coordinate with Prairie Village and the community; and restore Porter Park’s baseball field.
- **Commercial context:** Estimated project cost is $12–17 million, including engineering, easements, land acquisition, and construction. The planning estimate is approximately $13.1 million with escalation. Construction is contingent on County approval and agreement on an acceptable price and schedule.
- **OEMs and vendors:** No equipment manufacturers, OEMs, or prospective vendors are named; products are specified by type and capacity rather than brand or part number.

### Description

Johnson County Wastewater (JCW) is seeking statements of qualifications from Design-Build teams for preconstruction and design services, with the option of construction services, for the Brush Creek Pump Station Improvements Project (Contract No. MTM1-C080). The procurement has three phases: qualifications and shortlisting, proposals from shortlisted firms, and interviews. The project addresses aging pump station assets and facility needs, including code compliance and future wet-weather flows. The RFQ states an estimated total project cost of $12–$17 million, including engineering, easements, land acquisitions, and construction.

[View original listing](https://jocogov.ionwave.net/PublicDetail.aspx?bidID=2133&SourceType=1)