Opportunity
Alaska Online Public Notices #POA-1978-00210 v1.0
DEC review of Kodiak boatyard dock-repair water-quality certification
Posted
November 16, 2026
Respond By
December 18, 2026
Identifier
POA-1978-00210 v1.0
The Alaska Department of Environmental Conservation is reviewing a Clean Water Act Section 401 certification request for repairs at the Kodiak Marine Way Boatyard—not seeking bids for a procurement. - Government buyer: Alaska Department of Environmental Conservation (DEC); no sub-agency or office is identified. - Applicant and named organizations: Marine Way Boatyard is the project applicant. R&M Engineering Ketchikan prepared the application; it is not identified as a procurement vendor. The project is associated with USACE permit application POA-1978-00210. - Proposed work: Repair and replace deteriorating docks, pilings, and the west pier; add an 18-by-31-foot dock connector/infill supported by six piles; and create a contiguous working platform. Plans also show dock reinforcement, fender piles, and pile encapsulation repairs. - Materials and quantities: The project description proposes removing about 137 existing piles and installing 92 permanent 12-inch steel piles. It also identifies approximately 500 cubic yards of shot rock and 100 cubic yards of riprap/armor rock for stabilization; drawings include HP 14X102 steel pile caps, timber decking and structural members, and a PILEFORM F pile-encapsulation detail. Drawing-level quantities are generally unspecified. - Notable requirements and considerations: Steel support beams are expected to reduce the overall pile count by about 25% (approximately 16 fewer piles). The application identifies turbidity, sediment, petroleum hydrocarbons, and metals as potential concerns, with marine best management practices and monitoring planned. - OEMs and procurement status: No OEMs or purchase vendors are identified. Materials shown in the plans are project components, not a solicitation bill of materials. This is a regulatory certification and public-comment notice, not a goods-or-services solicitation or award.
Description
Marine Way Boatyard proposes repairs and replacement of deteriorating docks and other infrastructure at its existing Kodiak commercial boatyard and vessel haul-out facility. Work includes removing and replacing dock structures and piles, installing a dock connector, and placing shot rock and riprap to stabilize a failing sheet-pile wall. The notice states that approximately 500 cubic yards of shot rock and 100 cubic yards of riprap would be placed below the high-tide line in Kodiak Harbor, with silt curtains and other controls to limit impacts. Proposed activity dates are May 1, 2027 through October 31, 2027.