# Alaska Online Public Notices #POA-1978-00210 v1.0

DEC review of Kodiak boatyard dock-repair water-quality certification

**Posted:** November 16, 2026
**Respond By:** December 18, 2026
**Identifier:** POA-1978-00210 v1.0

The Alaska Department of Environmental Conservation is reviewing a Clean Water Act Section 401 certification request for repairs at the Kodiak Marine Way Boatyard—not seeking bids for a procurement.
- **Government buyer:** Alaska Department of Environmental Conservation (DEC); no sub-agency or office is identified.
- **Applicant and named organizations:** Marine Way Boatyard is the project applicant. R&M Engineering Ketchikan prepared the application; it is not identified as a procurement vendor. The project is associated with USACE permit application POA-1978-00210.
- **Proposed work:** Repair and replace deteriorating docks, pilings, and the west pier; add an 18-by-31-foot dock connector/infill supported by six piles; and create a contiguous working platform. Plans also show dock reinforcement, fender piles, and pile encapsulation repairs.
- **Materials and quantities:** The project description proposes removing about 137 existing piles and installing 92 permanent 12-inch steel piles. It also identifies approximately 500 cubic yards of shot rock and 100 cubic yards of riprap/armor rock for stabilization; drawings include HP 14X102 steel pile caps, timber decking and structural members, and a PILEFORM F pile-encapsulation detail. Drawing-level quantities are generally unspecified.
- **Notable requirements and considerations:** Steel support beams are expected to reduce the overall pile count by about 25% (approximately 16 fewer piles). The application identifies turbidity, sediment, petroleum hydrocarbons, and metals as potential concerns, with marine best management practices and monitoring planned.
- **OEMs and procurement status:** No OEMs or purchase vendors are identified. Materials shown in the plans are project components, not a solicitation bill of materials. This is a regulatory certification and public-comment notice, not a goods-or-services solicitation or award.

### Description

Marine Way Boatyard proposes repairs and replacement of deteriorating docks and other infrastructure at its existing Kodiak commercial boatyard and vessel haul-out facility. Work includes removing and replacing dock structures and piles, installing a dock connector, and placing shot rock and riprap to stabilize a failing sheet-pile wall. The notice states that approximately 500 cubic yards of shot rock and 100 cubic yards of riprap would be placed below the high-tide line in Kodiak Harbor, with silt curtains and other controls to limit impacts. Proposed activity dates are May 1, 2027 through October 31, 2027.

[View original listing](https://aws.state.ak.us/OnlinePublicNotices/notices/View.aspx?id=225883)