Opportunity

Utah Public Procurement Place U3P #CS27029

Rockport State Park replacement well and pumphouse system construction

Posted

November 10, 2026

Respond By

December 16, 2026

Identifier

CS27029

NAICS

237110

Utah is seeking construction bids to replace the well and upgrade related systems at Rockport State Park in Peoa. - Government buyer: State of Utah, Department of Natural Resources and Utah State Parks; Utah Department of Administrative Services, Division of Facilities Construction and Management (DFCM), including its Division of Facilities. Attachment contacts named Mathew Daley, Mat Daley, and Mrs. Aubrey Stapel. - Project: Drill and complete a replacement well, connect it to the existing pumphouse, abandon the existing well, and perform associated site, well-house, water-system, electrical, and controls work. Estimated construction cost: $550,000. - Specified products and quantities: 14-inch surface casing (40 LF); 8-inch production casing (282 LF); 8-inch louvered well screen (220 LF); gravel pack and bentonite plug (227); production-casing well seal (70); 2-inch HDPE pipe (15); 2-inch PVC drop pipe (480); 2-inch check valve (1); submersible pump and motor (1); well cap (1); 2-inch DR-9 PE4710 IPS HDPE water line (13 LF); pitless adapter (1); water meter (1, salvaged and reinstalled); electrical panel (1); variable frequency drive (1); and level transducer (1). Other specified items include a sounder tube and production casing, drop pipe, and check valve detailed in the plans. - Pump and controls requirements: Pump must provide 50 GPM at 610 feet total dynamic head, with a minimum 15 HP motor; bid intake setting is 480 feet below ground, subject to final selection after test pumping. A 240V VFD is specified for a 20 HP pump, with harmonics mitigation/sine-wave filter. PLC and telemetry work must coordinate with the owner’s system integrator; SCADA contractor performs terminations. - Named OEMs/brands: Ful Flo (well screen), Keller (level transmitter or equal), Johnson Screens (JSL Rapid PVC drop pipe), Boshart Industries (P-200-SS pitless adapter or approved equal), Flomatic (80DI check valve or equal), and Zenner (Stealth F35 water meter, existing unit to be reused). No part numbers are given for the pump and motor. - Other notable requirements: Approximately 500-foot well; Utah well and drinking-water standards, NSF certifications, testing, disinfection, flushing, pressure testing, and discharge and erosion controls. Asbestos-containing materials in the pumphouse must be removed by a licensed abatement contractor before disturbance; lead-containing materials require trained, certified personnel. Remove and properly dispose of 9 fluorescent bulbs, 3 PCB ballasts, 1 fire extinguisher, and 1 thermometer before demolition. - Work timing: Begin within 30 days of Notice to Proceed and achieve substantial completion within 100 days after work begins. The procurement documents also require first-tier subcontractor information and applicable Utah licensing and project-standard compliance.

Description

The State of Utah Division of Facilities Construction and Management is seeking bids for construction work at Rockport State Park in Peoa, Utah. The work is to drill a replacement well and connect it to the existing pumphouse. The construction cost estimate is $550,000. A mandatory bidder meeting is scheduled, and bids must include a bid bond; the solicitation also requires submitting a subcontractor list by its stated deadline.

View original listing