# Utah Public Procurement Place U3P #CS27029

Rockport State Park replacement well and pumphouse system construction

**Posted:** November 10, 2026
**Respond By:** December 16, 2026
**Identifier:** CS27029
**NAICS:** 237110

Utah is seeking construction bids to replace the well and upgrade related systems at Rockport State Park in Peoa.
- **Government buyer:** State of Utah, Department of Natural Resources and Utah State Parks; Utah Department of Administrative Services, Division of Facilities Construction and Management (DFCM), including its Division of Facilities. Attachment contacts named Mathew Daley, Mat Daley, and Mrs. Aubrey Stapel.
- **Project:** Drill and complete a replacement well, connect it to the existing pumphouse, abandon the existing well, and perform associated site, well-house, water-system, electrical, and controls work. Estimated construction cost: $550,000.
- **Specified products and quantities:** 14-inch surface casing (40 LF); 8-inch production casing (282 LF); 8-inch louvered well screen (220 LF); gravel pack and bentonite plug (227); production-casing well seal (70); 2-inch HDPE pipe (15); 2-inch PVC drop pipe (480); 2-inch check valve (1); submersible pump and motor (1); well cap (1); 2-inch DR-9 PE4710 IPS HDPE water line (13 LF); pitless adapter (1); water meter (1, salvaged and reinstalled); electrical panel (1); variable frequency drive (1); and level transducer (1). Other specified items include a sounder tube and production casing, drop pipe, and check valve detailed in the plans.
- **Pump and controls requirements:** Pump must provide 50 GPM at 610 feet total dynamic head, with a minimum 15 HP motor; bid intake setting is 480 feet below ground, subject to final selection after test pumping. A 240V VFD is specified for a 20 HP pump, with harmonics mitigation/sine-wave filter. PLC and telemetry work must coordinate with the owner’s system integrator; SCADA contractor performs terminations.
- **Named OEMs/brands:** **Ful Flo** (well screen), **Keller** (level transmitter or equal), **Johnson Screens** (JSL Rapid PVC drop pipe), **Boshart Industries** (P-200-SS pitless adapter or approved equal), **Flomatic** (80DI check valve or equal), and **Zenner** (Stealth F35 water meter, existing unit to be reused). No part numbers are given for the pump and motor.
- **Other notable requirements:** Approximately 500-foot well; Utah well and drinking-water standards, NSF certifications, testing, disinfection, flushing, pressure testing, and discharge and erosion controls. Asbestos-containing materials in the pumphouse must be removed by a licensed abatement contractor before disturbance; lead-containing materials require trained, certified personnel. Remove and properly dispose of 9 fluorescent bulbs, 3 PCB ballasts, 1 fire extinguisher, and 1 thermometer before demolition.
- **Work timing:** Begin within 30 days of Notice to Proceed and achieve substantial completion within 100 days after work begins. The procurement documents also require first-tier subcontractor information and applicable Utah licensing and project-standard compliance.

### Description

The State of Utah Division of Facilities Construction and Management is seeking bids for construction work at Rockport State Park in Peoa, Utah. The work is to drill a replacement well and connect it to the existing pumphouse. The construction cost estimate is $550,000. A mandatory bidder meeting is scheduled, and bids must include a bid bond; the solicitation also requires submitting a subcontractor list by its stated deadline.

[View original listing](https://utah.bonfirehub.com/opportunities/262371)