Opportunity

City of Rosemead PlanetBids #147781

Rosemead City Hall elevator replacement and ADA improvements

Posted

October 28, 2026

Respond By

December 16, 2026

Identifier

147781

NAICS

236220, 238290, 238210, 238220

The City of Rosemead is seeking a construction contractor to replace the City Hall elevator and deliver related building and accessibility improvements. - Government buyer: City of Rosemead, Public Works Department, Engineering Division. - Project scope: Remove the existing elevator; install one three-stop modular elevator; build the new pit, tower and enclosure; and perform associated structural, architectural, electrical, plumbing, HVAC, demolition, site and ADA improvement work. - Elevator equipment: Plans identify Modular Elevator Manufacturing, model HW-3A, one elevator with 3,000-lb capacity, hydraulic operation, 100 FPM speed, three landings and 11-ft travel. The bid schedule also identifies one modular elevator system under D1010. Manufacturer details are preliminary, and the final approved plans were pending an addendum. - Other named manufacturers/products: Lithonia Lighting is identified for a wall sconce (TWP LED ALO 50K); Daikin is named as an acceptable manufacturer or equivalent for the indoor fan-coil unit. No manufacturer is specified for the AC-1 or CU-1 equipment designations. - Named prospective bidders: Schindler Elevator, Bedrock Group, Inc., CA Traffic Solution, Kern County Builders Exchange and Kressa LLC. These are listed as prospective bidders, not required suppliers or specified elevator manufacturers. - Notable requirements: The project includes a new elevator power connection, emergency-power feeder work, elevator sump/drainage work, and related building-system modifications. Completion is required within 120 working days, including material procurement; work is to start within 10 working days after the Notice to Proceed. The opportunity summary reports an estimated project value of approximately $1.1 million.

Description

The project renovates the existing elevator serving Rosemead City Hall, removing it and replacing it with a 3-stop modular elevator and a new power connection from the existing electrical room. Work also includes constructing a new elevator pit and enclosure, related appurtenances shown in the plans and specifications, and incidental work needed to complete the project. A mandatory pre-bid meeting is required, and the notice states that only bidders attending the meeting will be considered. The specifications estimate the project at $1,100,000 and allow 120 working days for completion.

View original listing