# City of Rosemead PlanetBids #147781

Rosemead City Hall elevator replacement and ADA improvements

**Posted:** October 28, 2026
**Respond By:** December 16, 2026
**Identifier:** 147781
**NAICS:** 236220, 238290, 238210, 238220

The City of Rosemead is seeking a construction contractor to replace the City Hall elevator and deliver related building and accessibility improvements.
- **Government buyer:** City of Rosemead, Public Works Department, Engineering Division.
- **Project scope:** Remove the existing elevator; install one three-stop modular elevator; build the new pit, tower and enclosure; and perform associated structural, architectural, electrical, plumbing, HVAC, demolition, site and ADA improvement work.
- **Elevator equipment:** Plans identify **Modular Elevator Manufacturing**, model **HW-3A**, one elevator with 3,000-lb capacity, hydraulic operation, 100 FPM speed, three landings and 11-ft travel. The bid schedule also identifies one modular elevator system under **D1010**. Manufacturer details are preliminary, and the final approved plans were pending an addendum.
- **Other named manufacturers/products:** Lithonia Lighting is identified for a wall sconce (TWP LED ALO 50K); Daikin is named as an acceptable manufacturer or equivalent for the indoor fan-coil unit. No manufacturer is specified for the AC-1 or CU-1 equipment designations.
- **Named prospective bidders:** Schindler Elevator, Bedrock Group, Inc., CA Traffic Solution, Kern County Builders Exchange and Kressa LLC. These are listed as prospective bidders, not required suppliers or specified elevator manufacturers.
- **Notable requirements:** The project includes a new elevator power connection, emergency-power feeder work, elevator sump/drainage work, and related building-system modifications. Completion is required within 120 working days, including material procurement; work is to start within 10 working days after the Notice to Proceed. The opportunity summary reports an estimated project value of approximately $1.1 million.

### Description

The project renovates the existing elevator serving Rosemead City Hall, removing it and replacing it with a 3-stop modular elevator and a new power connection from the existing electrical room. Work also includes constructing a new elevator pit and enclosure, related appurtenances shown in the plans and specifications, and incidental work needed to complete the project. A mandatory pre-bid meeting is required, and the notice states that only bidders attending the meeting will be considered. The specifications estimate the project at $1,100,000 and allow 120 working days for completion.

[View original listing](https://vendors.planetbids.com/portal/54150/bo/bo-detail/147781)
