Opportunity

City of Santa Rosa PlanetBids #147680

Foster Road Sewer Main Rehabilitation with UV-Cured CIPP Lining

Posted

October 23, 2026

Respond By

November 19, 2026

Identifier

147680

NAICS

237110

Laguna County Sanitation District is seeking a contractor to rehabilitate the Foster Road sewer main in Santa Maria, California. - Government buyer: Laguna County Sanitation District, County of Santa Barbara, Department of Public Works. - Scope: Rehabilitate approximately 0.9 miles of 12-inch vitrified clay sewer main using UV-cured cured-in-place pipe (CIPP) lining. - Estimated quantities include 4,753 LF of liner, 951 joint pressure tests, 143 grout injections, 1,868 gallons of chemical grout, six lateral reinstatements, and two point repairs. - Related work includes pipe cleaning, pre- and post-rehabilitation CCTV inspections, sewage bypassing, traffic control, dust control, and stormwater measures. - Technical requirements: Fiberglass-reinforced liner with a minimum 5.0 mm thickness; certified UV-CIPP installation; specified UV-CIPP and point-repair equipment available on site; and materials meeting cited ASTM, Greenbook, and project specification requirements. - OEMs and vendors: No specific OEMs, manufacturers, or vendors are named. Chemical grout types are described generically. - Estimated value: Engineer’s estimate is $543,000. - Completion and delay requirements: Substantial completion within 80 working days and final completion within 90 working days after contract time begins. Liquidated damages are $600 per day for delay to either milestone; the assessments are not concurrent.

Description

The project will rehabilitate approximately 0.9 miles of 12-inch vitrified clay sewer main parallel to Foster Road between Blosser Road and Foxenwood Lane using a cured-in-place-pipe liner. Work also includes pressure testing and packer injection grouting of pipe joints, re-establishing sewer laterals, pre- and post-rehabilitation sewer video inspections, sewer bypassing, stormwater controls, and related work shown in the project drawings and specifications. The notice states an engineer’s estimate of $543,000, substantial completion within 80 working days, and final completion within 90 working days. Bids are due November 19, 2026, at 2:00 p.m.

View original listing