# City of Santa Rosa PlanetBids #147680

Foster Road Sewer Main Rehabilitation with UV-Cured CIPP Lining

**Posted:** October 23, 2026
**Respond By:** November 19, 2026
**Identifier:** 147680
**NAICS:** 237110

Laguna County Sanitation District is seeking a contractor to rehabilitate the Foster Road sewer main in Santa Maria, California.
- **Government buyer:** Laguna County Sanitation District, County of Santa Barbara, Department of Public Works.
- **Scope:** Rehabilitate approximately 0.9 miles of 12-inch vitrified clay sewer main using UV-cured cured-in-place pipe (CIPP) lining.
  - Estimated quantities include 4,753 LF of liner, 951 joint pressure tests, 143 grout injections, 1,868 gallons of chemical grout, six lateral reinstatements, and two point repairs.
  - Related work includes pipe cleaning, pre- and post-rehabilitation CCTV inspections, sewage bypassing, traffic control, dust control, and stormwater measures.
- **Technical requirements:** Fiberglass-reinforced liner with a minimum 5.0 mm thickness; certified UV-CIPP installation; specified UV-CIPP and point-repair equipment available on site; and materials meeting cited ASTM, Greenbook, and project specification requirements.
- **OEMs and vendors:** No specific OEMs, manufacturers, or vendors are named. Chemical grout types are described generically.
- **Estimated value:** Engineer’s estimate is $543,000.
- **Completion and delay requirements:** Substantial completion within 80 working days and final completion within 90 working days after contract time begins. Liquidated damages are $600 per day for delay to either milestone; the assessments are not concurrent.

### Description

The project will rehabilitate approximately 0.9 miles of 12-inch vitrified clay sewer main parallel to Foster Road between Blosser Road and Foxenwood Lane using a cured-in-place-pipe liner. Work also includes pressure testing and packer injection grouting of pipe joints, re-establishing sewer laterals, pre- and post-rehabilitation sewer video inspections, sewer bypassing, stormwater controls, and related work shown in the project drawings and specifications. The notice states an engineer’s estimate of $543,000, substantial completion within 80 working days, and final completion within 90 working days. Bids are due November 19, 2026, at 2:00 p.m.

[View original listing](https://vendors.planetbids.com/portal/43874/bo/bo-detail/147680)
