Opportunity
SAM #1240LT27Q0012
Remove two underground fuel tanks and restore the Nelson Drive housing site
Buyer
USFS CSA Intermountain Region 8
Posted
October 23, 2026
Respond By
November 14, 2026
Identifier
1240LT27Q0012
NAICS
237120, 562910
The USDA Forest Service is seeking a contractor to remove underground heating-oil tanks and restore the site at the Nelson Drive housing complex on the Bridger-Teton National Forest. - Government buyer: U.S. Department of Agriculture (USDA), Forest Service; identified offices include CSA Intermountain 8, Region 4, and the Bridger-Teton National Forest’s Jackson Ranger District. - Scope: Remove and dispose of two approximately 300-gallon underground steel heating-oil tanks, associated piping, and appurtenances at 350 and 360 Nelson Drive in Jackson, Wyoming. Work includes soil sampling, excavation, backfill, and restoration of the site. - Additional work: Mobilization; selective removal of concrete and grassed areas as needed; and concrete sidewalk restoration. The attachments differ on sidewalk quantities: one schedule lists 500 square feet of 4-inch concrete removal, while another describes approximately 300 square feet of replacement at an additional dwelling. - Optional work: Remove and dispose of contaminated soil at an authorized facility, with a maximum quantity of 20 cubic yards. Soil testing and cleanup/disposal are also included in the base-work descriptions where contamination is found. - Requirements: Tank decommissioning must meet Wyoming Department of Environmental Quality (WYDEQ) requirements. Contractors must protect occupied residences, adjacent structures, and utilities; field-verify site conditions; and restore disturbed areas. - Named OEMs and commercial vendors: No product manufacturers, OEMs, or commercial vendors are identified. WYDEQ is named as a regulatory agency, not a vendor. - Performance: Contract work is scheduled for 30 calendar days, with tank and contaminated-soil removal specified for completion within 21 calendar days.
Description
This project includes the removal of two existing steel underground fuel storage tanks at the Nelson Drive housing complex on the Bridger-Teton National Forest; two 300-gallon steel underground fuel storage tanks associated with two neighboring residential dwellings. This includes cleanup and disposal of any contaminated soils. Contractor shall field verify all new and existing conditions affecting the work of this contract before ordering products.