Opportunity

SAM #N6817127QN006

Voyage repair and shipboard maintenance for USS Rafael Peralta in Mombasa

Buyer

NAVSUP FLC Sigonella Naples

Posted

October 23, 2026

Respond By

October 30, 2026

Identifier

N6817127QN006

NAICS

336611, 488390

The Department of the Navy is seeking voyage repairs for USS Rafael Peralta (DDG 115) in Mombasa, Kenya, including shipboard maintenance, equipment cleaning and inspection, and support services. - Government buyer: Department of the Navy; NAVSUP Fleet Logistics Center Sigonella (FLCSI), Site Naples, Naval Regional Contracting Center Detachment. The procurement documents also identify FDRMC Naples. - Vessel and scope: Firm-fixed-price repair work for USS Rafael Peralta (DDG 115), under specification NAPL-009-27. One aggregate contract line item covers all nine work items. - OEM: York International Corporation (also cited as York Intl Corp), identified for the air-conditioning and refrigeration plant condensers. No other OEMs or vendors are named. - Products and identified quantities: - Two York No. 1 and No. 4 air-conditioning plant condensers; manufacturer ID 376-58504, APL 321550028. - Two York refrigeration plant condensers; APL 32A990081. - 10 square feet of medical bench upholstery, specified as heavy-duty marine/medical-grade blue vinyl or leather-grain synthetic fabric. - One set of mobile steel-tube-and-clamp scaffolding for the hangar bay, approximately 15 feet high by 20 feet wide. - Repair and support work: Remove corrosion from approximately 2,000 square feet of ship surfaces; replace specified insulation and lagging; inspect the ventilation weather hood and extract deteriorated fasteners; clean and inspect both AC condensers and both refrigeration condensers; wash the hull; replace medical bench upholstery; provide scaffolding; and provide crane and rigging support. - Notable requirements: Borescope-inspect 100% of the 662 AC condenser tubes; preserve the existing hull coating during high-pressure washing; provide rigging for 100 lifts with a 10,000-pound maximum lift; keep daily lift and labor logs; and remove temporary services and leave the ship within 24 hours when directed. - Performance: Work is associated with the FY-27 availability and is expected to take approximately one week. Rigging support is required throughout the availability. No option years or annual subscription are identified. - Pricing: The pricing worksheet and travel fields show zero values in the available summary; no reliable contract-value estimate is provided.

Description

Ship Repair located in Mombasa for a US Navy Ship

View original listing