# SAM #N6817127QN006

Voyage repair and shipboard maintenance for USS Rafael Peralta in Mombasa

**Buyer:** NAVSUP FLC Sigonella Naples
**Posted:** October 23, 2026
**Respond By:** October 30, 2026
**Identifier:** N6817127QN006
**NAICS:** 336611, 488390

The Department of the Navy is seeking voyage repairs for USS Rafael Peralta (DDG 115) in Mombasa, Kenya, including shipboard maintenance, equipment cleaning and inspection, and support services.
- **Government buyer:** Department of the Navy; NAVSUP Fleet Logistics Center Sigonella (FLCSI), Site Naples, Naval Regional Contracting Center Detachment. The procurement documents also identify FDRMC Naples.
- **Vessel and scope:** Firm-fixed-price repair work for USS Rafael Peralta (DDG 115), under specification NAPL-009-27. One aggregate contract line item covers all nine work items.
- **OEM:** **York International Corporation (also cited as York Intl Corp)**, identified for the air-conditioning and refrigeration plant condensers. No other OEMs or vendors are named.
- **Products and identified quantities:**
  - Two York No. 1 and No. 4 air-conditioning plant condensers; manufacturer ID 376-58504, APL 321550028.
  - Two York refrigeration plant condensers; APL 32A990081.
  - 10 square feet of medical bench upholstery, specified as heavy-duty marine/medical-grade blue vinyl or leather-grain synthetic fabric.
  - One set of mobile steel-tube-and-clamp scaffolding for the hangar bay, approximately 15 feet high by 20 feet wide.
- **Repair and support work:** Remove corrosion from approximately 2,000 square feet of ship surfaces; replace specified insulation and lagging; inspect the ventilation weather hood and extract deteriorated fasteners; clean and inspect both AC condensers and both refrigeration condensers; wash the hull; replace medical bench upholstery; provide scaffolding; and provide crane and rigging support.
- **Notable requirements:** Borescope-inspect 100% of the 662 AC condenser tubes; preserve the existing hull coating during high-pressure washing; provide rigging for 100 lifts with a 10,000-pound maximum lift; keep daily lift and labor logs; and remove temporary services and leave the ship within 24 hours when directed.
- **Performance:** Work is associated with the FY-27 availability and is expected to take approximately one week. Rigging support is required throughout the availability. No option years or annual subscription are identified.
- **Pricing:** The pricing worksheet and travel fields show zero values in the available summary; no reliable contract-value estimate is provided.

### Description

<p>Ship Repair located in Mombasa for a US Navy Ship</p>

[View original listing](https://sam.gov/opp/dc905f0a16634658b6fe81a9a35c57a5/view)
