Gila National Forest vault toilet demolition, relocation, and CXT Gunnison toilet options

Buyer

Gila National Forest

Posted

October 22, 2026

Respond By

November 17, 2026

Identifier

127EAX27Q0007

NAICS

238910, 562991, 238110, 423390

The USDA Forest Service’s Gila National Forest is seeking contractors to remove, relocate, and supply vault toilets at recreation sites in New Mexico. - Government buyer: U.S. Department of Agriculture (USDA), Forest Service; Gila National Forest; USDA-FS CSA Southwest 7. - OEMs named: CXT (Gunnison-style vault toilets) and Romtec (existing toilets identified for demolition). No part numbers are specified. - Base work: Demolish five existing toilets—three Romtec units, one Kingston Campground unit, and one Emory Pass Heliport fiberglass unit—and decommission, transport, and reinstall three existing CXT Gunnison toilets: - San Fran Hot Springs to Bighorn Campground. - Mogollon to Gomez Peak. - Lower Gallinas Campground to Little Walnut Day Use Area. - Optional products: One new CXT Gunnison-style, single-user toilet with installation at Head of Ditch Campground, and one new CXT Gunnison-style toilet for delivery only to Fort Bayard Administrative Site. Both are specified as 6 ft 6 in × 14 ft 8 in, right-hand screen, Buckskin finish, and brand name or equal; the specifications also call for barnwood wall texture and a cedar-shake roof texture. - Optional related work: Demolish the existing Romtec toilet at Head of Ditch Campground as part of the installation option. The delivery-only option does not include installation. - Site and construction requirements: Provide three concrete aprons/slabs at the relocated CXT toilets, approximately 14 ft 7½ in × 5 ft × 4 in thick, with Van Horn Roll finish. The detailed specifications call for a concrete strength of at least 3,500 psi at 28 days. Work also includes pumping and cleaning vaults, waste disposal at an approved facility, backfilling, compaction, grading, site restoration, and contractor-provided labor, equipment, transport, and cleanup. New toilet specifications include a 1,000-gallon concrete waste vault with polyethylene liner and accessibility and structural requirements. - Performance period: Begin work within 10 calendar days after receiving the Notice to Proceed and complete the work, including cleanup, within 90 calendar days after the Notice to Proceed.

Description

Commercial Construction Requirement 

Furnish all materials, labor, equipment, supervision, tools, and utilities required to perform operations necessary to (A) demolish five existing vault toilets and to (B) decommission and then relocate three other CXT® style vault toilets. There is one option item that includes the demolition of one single user Romtec® vault toilet and the procurement and installation of a new CXT® “Gunnison” single user vault toilet. A second option is to procure a toilet and have it delivered but with no installation.

View original listing