Opportunity

City of Sacramento PlanetBids #B27191121003

Tahoe Tallac Park field, irrigation, turf, and amenity renovations

Posted

October 20, 2026

Respond By

November 19, 2026

Identifier

B27191121003

NAICS

237990, 238990, 238910, 238190

The City of Sacramento is seeking contractors to renovate fields and park amenities at Tahoe Tallac Park. - Government buyer: City of Sacramento, Department of Youth, Parks & Community Enrichment; Park Planning & Development Services and Contracts and Compliance Services. - Scope: Renovate Fields 1, 2, and 3, including infield and turf work, irrigation adjustments, installation of park amenities, and four ADA parking signs. - Named manufacturers and vendors: Knaack (one 16-cu.-ft. jobsite box, model H-10011), Park N Pool (one six-foot scorer’s table, model 12ST-0016), and Hunter (up to eight I-25 irrigation rotors). Uline is named as a source for the Knaack box; the signs are provided by the City. - Field work and quantities: Scrape and replenish the infields; plans show approximately 13,750 sq. ft. for Fields 1 and 2 and 10,900 sq. ft. for Field 3. The Fields 1 and 2 mix quantity conflicts between 20 and 22 cubic yards per field. Overseed approximately 56,000 sq. ft. of Field 3 with a mix of 80% turf-type tall fescue, 10% ryegrass, and 10% Kentucky bluegrass; fill Field 1 turf low spots with topsoil. - Other specified work: Install four ADA parking signs (three on an adjacent building or restroom and one on a new post). Additive Alternate A1 replaces the concession-stand trench drain and associated concrete flatwork; Alternate A2 provides and maintains temporary construction fencing around the drain work. - Notable requirements: Field 3 fertilizer is specified as 16-6-8 N-P-K at 6 lb. per 1,000 sq. ft. The construction period is 20 working days, with a plant establishment period also required but not specified in duration. - Estimated construction cost: $120,670 for the base bid and $129,470 including additive alternates.

Description

The City of Sacramento is seeking bids for improvements at Tahoe Tallac Park, including field renovations, irrigation repairs and adjustments, turf work, and installation of a scorer’s table, storage container, and ADA parking signs. Work also includes a plant establishment period. An additive alternate includes removing and replacing the existing trench drain system at the concession stand. The stated estimated construction cost is $120,670 for the base bid and $129,470 with additive alternates; construction time is 20 working days.

View original listing