# City of Sacramento PlanetBids #B27191121003

Tahoe Tallac Park field, irrigation, turf, and amenity renovations

**Posted:** October 20, 2026
**Respond By:** November 19, 2026
**Identifier:** B27191121003
**NAICS:** 237990, 238990, 238910, 238190

The City of Sacramento is seeking contractors to renovate fields and park amenities at Tahoe Tallac Park.
- **Government buyer:** City of Sacramento, Department of Youth, Parks & Community Enrichment; Park Planning & Development Services and Contracts and Compliance Services.
- **Scope:** Renovate Fields 1, 2, and 3, including infield and turf work, irrigation adjustments, installation of park amenities, and four ADA parking signs.
- **Named manufacturers and vendors:** **Knaack** (one 16-cu.-ft. jobsite box, model H-10011), **Park N Pool** (one six-foot scorer’s table, model 12ST-0016), and **Hunter** (up to eight I-25 irrigation rotors). Uline is named as a source for the Knaack box; the signs are provided by the City.
- **Field work and quantities:** Scrape and replenish the infields; plans show approximately 13,750 sq. ft. for Fields 1 and 2 and 10,900 sq. ft. for Field 3. The Fields 1 and 2 mix quantity conflicts between 20 and 22 cubic yards per field. Overseed approximately 56,000 sq. ft. of Field 3 with a mix of 80% turf-type tall fescue, 10% ryegrass, and 10% Kentucky bluegrass; fill Field 1 turf low spots with topsoil.
- **Other specified work:** Install four ADA parking signs (three on an adjacent building or restroom and one on a new post). Additive Alternate A1 replaces the concession-stand trench drain and associated concrete flatwork; Alternate A2 provides and maintains temporary construction fencing around the drain work.
- **Notable requirements:** Field 3 fertilizer is specified as 16-6-8 N-P-K at 6 lb. per 1,000 sq. ft. The construction period is 20 working days, with a plant establishment period also required but not specified in duration.
- **Estimated construction cost:** $120,670 for the base bid and $129,470 including additive alternates.

### Description

The City of Sacramento is seeking bids for improvements at Tahoe Tallac Park, including field renovations, irrigation repairs and adjustments, turf work, and installation of a scorer’s table, storage container, and ADA parking signs. Work also includes a plant establishment period. An additive alternate includes removing and replacing the existing trench drain system at the concession stand. The stated estimated construction cost is $120,670 for the base bid and $129,470 with additive alternates; construction time is 20 working days.

[View original listing](https://vendors.planetbids.com/portal/15300/bo/bo-detail/147512)
