Opportunity
New York State Contract Reporter #2140031
PE-Stamped Design for Generac Standby Generator Replacement at Wedgewood IRA
Posted
October 19, 2026
Respond By
November 12, 2026
Identifier
2140031
NAICS
541330, 541310
OPWDD is seeking professional engineering design for a standby generator replacement at Wedgewood IRA in Middletown, New York. - Government buyer: New York State Office for People With Developmental Disabilities (OPWDD), Hudson Valley DDSO Business Office. - OEM: Generac is specified for the standby generator; the design must also include an automatic transfer switch. No specific model or part number is provided. - Requested service: One design project to replace the existing diesel generator with a natural-gas- or propane-fueled whole-house standby system. The work includes reviewing the existing pad and electrical service, surveying the site, analyzing whole-house electrical loads, and sizing the system. - Design requirements: Provide electrical, gas-piping, and conduit plans; a one-line electrical diagram; and an installation cost estimate. Address a cold-weather start kit, block and battery heaters, a generator service outlet, an accessible exterior disconnect, and underground line tracer and burial tape. - Deliverables and schedule: Submit PE-stamped drawings in PDF and CAD (.dwg) formats for OPWDD engineer acceptance. Complete the work within 30 days of receiving the purchase order. - Other named vendors or OEMs: None besides Generac are identified in the supplied materials.
Description
This is a request for quotation for design-only services for a standby whole-house generator at Wedgewood IRA in Middletown, New York, replacing an existing diesel generator with a natural gas- or propane-fueled generator. The work includes providing PE-stamped design drawings in PDF and CAD formats, assessing the existing site and electrical services, specifying a generator and automatic transfer switch, and preparing a cost estimate for installation. The design must meet the stated code requirements and be accepted by the OPWDD engineer; the design work is to be completed within 30 days of receiving the purchase order. A mandatory site visit is required, and quotes are due November 12, 2026 at 2:00 PM.