Opportunity
Owasso Civicplus #294
Bailey Ranch Golf Club Hole 16 Bridge Replacement and Approach Restoration
Posted
October 13, 2026
Respond By
November 17, 2026
Identifier
294
NAICS
237310, 237990
The Owasso Public Golf Authority is seeking construction bids to replace the Bailey Ranch Golf Club Hole 16 bridge and restore its approaches. - Government buyer: Owasso Public Golf Authority, under the City of Owasso, Oklahoma; project coordination involves the City’s Public Works Department, Engineering Division. Named contacts in the documents include Civil Engineer Daniel Dearing and Corey Burd. - Bridge and OEMs: Furnish and install one 60-foot-by-12-foot pedestrian truss bridge, described as a half-through H-section with parallel chords and Pratt diagonals. No bridge OEM, manufacturer, or model part number is specified. The bridge supplier must provide final stamped and sealed structural design details and reinforcement schedules. - Construction items: 25 cubic yards of ODOT Class A, 3,000-psi concrete for abutments; 1,220 pounds of reinforcing steel; and 62 square yards of 6-inch-thick concrete cart path with curb, using ODOT Class AA, 4,000-psi concrete and Type A aggregate base. - Other work and materials: Remove and relocate the existing bridge to the City storage yard; demolish and dispose of existing concrete; install and remove a temporary 12-inch-thick mulch access road over filter fabric; and complete site restoration. Restoration includes Astro Bermuda sod (regular Bermuda is permitted with City approval), riprap and filter blanket at the abutments, grading, landscaping, and cart-path repairs. Plans show approximately 40 square yards of riprap; it is included in site restoration rather than separately paid. - Geotechnical information: Terracon prepared the project geotechnical reports and recommendations; it is not identified as a bridge supplier or bidder. The addendum recommends at least 24 inches of compacted ODOT Type A aggregate base beneath shallow footings, with a maximum net allowable bearing pressure of 2,000 psf, and geotechnical observation of footing excavations. The report also specifies minimum footing dimensions and depth. - Schedule: Construction is to reach substantial completion within 60 calendar days after Notice to Proceed and final completion within 90 calendar days. A two-year maintenance bond applies after project acceptance. No specific contract start date is stated.
Description
The solicitation is for renovation of a golf cart bridge at Bailey Ranch Golf Club, including removal and replacement of the existing bridge and a portion of the approaches on either side. The project documents describe installation of a new 60-foot by 12-foot bridge, bridge abutments, concrete cart path, and site restoration. Bids are due November 17, 2026, at 2:30 PM, and a representative must attend the mandatory pre-bid meeting on November 10, 2026, at 2:30 PM for the bid to be considered. Sealed bids are to be delivered to Public Works in Owasso, Oklahoma.