Opportunity

Utah Public Procurement Place U3P #GHID2026M

Design and CM/GC Preconstruction Services for West Lake Wastewater Pump Station Replacement

Posted

October 07, 2026

Respond By

October 22, 2026

Identifier

GHID2026M

NAICS

541330, 541620

Granger-Hunter Improvement District seeks a qualified consultant for design and CM/GC preconstruction services for the West Lake wastewater pump station replacement. - Buyer: Granger-Hunter Improvement District; no sub-agency or office is identified. The project is in West Valley City, Utah. - Project need: Relocate the existing station east of Bangerter Highway to accommodate a Utah Department of Transportation (UDOT) overpass. The replacement station is planned for approximately 212 GPM average flow and 276 GPM maximum flow. - Requested services: Investigations, hydraulic and alternatives evaluations, preliminary and final engineering design, pipeline replacement and relocation design, permitting and stakeholder coordination, cost estimating, scheduling, and CM/GC procurement and preconstruction support. - Design and delivery requirements: Plan for temporary connections, bypass pumping, sequencing, commissioning, and continued operation of the existing station until the replacement is operational. Evaluate flooded-suction, self-priming, and in-line pump configurations. Omit odor-control facilities unless findings show they are needed and the District authorizes that additional scope. - Coordination: Work with UDOT, its program manager and designer, West Valley City, utility owners, and other affected parties; support property, utility, permitting, reimbursement, and cost-reconciliation needs. - OEMs and vendors: No manufacturers, OEMs, or commercial vendors are named, and no specific equipment makes or part numbers are requested. - Qualifications: The project manager must be a Utah-licensed professional engineer. The team must have experience on at least three similar wastewater pump station projects and at least one UDOT coordination and CM/GC project. - Insurance: Commercial general liability of at least $2 million per occurrence and $3 million aggregate, and professional liability of at least $5 million. - Performance: Project completion is anticipated in 2028 to meet UDOT’s schedule; start date, total duration, and option periods are not specified.

Description

Granger-Hunter Improvement District is seeking statements of qualifications for engineering design and CM/GC preconstruction services for replacement of the West Lake Wastewater Pump Station. The existing station must be relocated east of Bangerter Highway to accommodate a UDOT overpass, with related wastewater pipeline replacements, relocations, and tie-ins. Services include investigations and design, coordination with UDOT and other parties, support for CM/GC procurement and preconstruction, cost estimates, schedules, and permitting. Submit a statement of qualifications only; do not include a fee proposal. SOQs are due October 21, 2026, at 5:00 PM Mountain Time.

View original listing