# Utah Public Procurement Place U3P #GHID2026M

Design and CM/GC Preconstruction Services for West Lake Wastewater Pump Station Replacement

**Posted:** October 07, 2026
**Respond By:** October 22, 2026
**Identifier:** GHID2026M
**NAICS:** 541330, 541620

Granger-Hunter Improvement District seeks a qualified consultant for design and CM/GC preconstruction services for the West Lake wastewater pump station replacement.
- **Buyer:** Granger-Hunter Improvement District; no sub-agency or office is identified. The project is in West Valley City, Utah.
- **Project need:** Relocate the existing station east of Bangerter Highway to accommodate a Utah Department of Transportation (UDOT) overpass. The replacement station is planned for approximately 212 GPM average flow and 276 GPM maximum flow.
- **Requested services:** Investigations, hydraulic and alternatives evaluations, preliminary and final engineering design, pipeline replacement and relocation design, permitting and stakeholder coordination, cost estimating, scheduling, and CM/GC procurement and preconstruction support.
- **Design and delivery requirements:** Plan for temporary connections, bypass pumping, sequencing, commissioning, and continued operation of the existing station until the replacement is operational. Evaluate flooded-suction, self-priming, and in-line pump configurations. Omit odor-control facilities unless findings show they are needed and the District authorizes that additional scope.
- **Coordination:** Work with UDOT, its program manager and designer, West Valley City, utility owners, and other affected parties; support property, utility, permitting, reimbursement, and cost-reconciliation needs.
- **OEMs and vendors:** No manufacturers, OEMs, or commercial vendors are named, and no specific equipment makes or part numbers are requested.
- **Qualifications:** The project manager must be a Utah-licensed professional engineer. The team must have experience on at least three similar wastewater pump station projects and at least one UDOT coordination and CM/GC project.
- **Insurance:** Commercial general liability of at least $2 million per occurrence and $3 million aggregate, and professional liability of at least $5 million.
- **Performance:** Project completion is anticipated in 2028 to meet UDOT’s schedule; start date, total duration, and option periods are not specified.

### Description

Granger-Hunter Improvement District is seeking statements of qualifications for engineering design and CM/GC preconstruction services for replacement of the West Lake Wastewater Pump Station. The existing station must be relocated east of Bangerter Highway to accommodate a UDOT overpass, with related wastewater pipeline replacements, relocations, and tie-ins. Services include investigations and design, coordination with UDOT and other parties, support for CM/GC procurement and preconstruction, cost estimates, schedules, and permitting. Submit a statement of qualifications only; do not include a fee proposal. SOQs are due October 21, 2026, at 5:00 PM Mountain Time.

[View original listing](https://utah.bonfirehub.com/opportunities/257539)