Opportunity
Hawaii eProcurement Portal #B27000492
Kahului Airport Phase 1 Apron Reconstruction and Concrete Repairs
Posted
October 02, 2026
Respond By
November 17, 2026
Identifier
B27000492
NAICS
237310
The State of Hawaii Department of Transportation, Airports Division, seeks construction services for Phase 1 apron and terminal-area repairs at Kahului Airport. - Government buyer: State of Hawaii Department of Transportation, Airports Division; Air and Water Transportation Facilities Division. - Project: Apron Reconstruction, Phase 1 (CM1530-33), at Kahului Airport, Maui. - Work requested: Repair deteriorated concrete and concrete masonry unit (CMU) surfaces at Holdroom F and Walkway EFF, repair adjacent apron concrete, and restripe pavement markings and gate lead-in lines. - Holdroom F concrete spall/delamination rehabilitation: 273 sq. ft.; concrete crack repair: 491 linear ft.; CMU crack repair: 12 linear ft.; reinforcing steel: 410 lb. - Apron concrete spall/void rehabilitation: 15 sq. ft.; apron concrete crack repair: 117 linear ft. - Pavement restriping is also required; no quantity is stated. - OEM: Sika is named for concrete repair, corrosion-inhibition, bonding, epoxy injection, grout, and sealant systems, or approved equals. No specific product part numbers or quantities are provided. - Estimated construction value: $2 million–$3 million. - Notable requirements: Contractor must hold a Hawaii General Engineering “A” license. Work must be phased to maintain airport operations and passenger screening; work-hour descriptions vary across the materials, generally specifying overnight work. Gate closures during construction may be continuous, 24 hours a day, seven days a week. At least 80% of the bidder’s project workforce must be Hawaii residents, and construction/demolition waste diversion must be at least 75%. Temporary pollution-control measures, dust and erosion controls, security measures, mobilization, and allowances for unforeseen conditions are included in the scope.
Description
The project involves repairing deteriorated exterior concrete and concrete masonry unit surfaces at Holdroom F and Walkway EFF, along with concrete repairs in the respective adjacent area at Kahului Airport. The estimated construction cost is between $2,000,000 and $3,000,000. Bids must be submitted through HIePRO by November 16, 2026, at 2:00 p.m. Hawaii Standard Time; bidders must hold a valid State of Hawaii General Engineering “A” license at the time of bidding.