# Hawaii eProcurement Portal #B27000492

Kahului Airport Phase 1 Apron Reconstruction and Concrete Repairs

**Posted:** October 02, 2026
**Respond By:** November 17, 2026
**Identifier:** B27000492
**NAICS:** 237310

The State of Hawaii Department of Transportation, Airports Division, seeks construction services for Phase 1 apron and terminal-area repairs at Kahului Airport.
- **Government buyer:** State of Hawaii Department of Transportation, Airports Division; Air and Water Transportation Facilities Division.
- **Project:** Apron Reconstruction, Phase 1 (CM1530-33), at Kahului Airport, Maui.
- **Work requested:** Repair deteriorated concrete and concrete masonry unit (CMU) surfaces at Holdroom F and Walkway EFF, repair adjacent apron concrete, and restripe pavement markings and gate lead-in lines.
  - Holdroom F concrete spall/delamination rehabilitation: 273 sq. ft.; concrete crack repair: 491 linear ft.; CMU crack repair: 12 linear ft.; reinforcing steel: 410 lb.
  - Apron concrete spall/void rehabilitation: 15 sq. ft.; apron concrete crack repair: 117 linear ft.
  - Pavement restriping is also required; no quantity is stated.
- **OEM:** **Sika** is named for concrete repair, corrosion-inhibition, bonding, epoxy injection, grout, and sealant systems, or approved equals. No specific product part numbers or quantities are provided.
- **Estimated construction value:** $2 million–$3 million.
- **Notable requirements:** Contractor must hold a Hawaii General Engineering “A” license. Work must be phased to maintain airport operations and passenger screening; work-hour descriptions vary across the materials, generally specifying overnight work. Gate closures during construction may be continuous, 24 hours a day, seven days a week. At least 80% of the bidder’s project workforce must be Hawaii residents, and construction/demolition waste diversion must be at least 75%. Temporary pollution-control measures, dust and erosion controls, security measures, mobilization, and allowances for unforeseen conditions are included in the scope.

### Description

The project involves repairing deteriorated exterior concrete and concrete masonry unit surfaces at Holdroom F and Walkway EFF, along with concrete repairs in the respective adjacent area at Kahului Airport. The estimated construction cost is between $2,000,000 and $3,000,000. Bids must be submitted through HIePRO by November 16, 2026, at 2:00 p.m. Hawaii Standard Time; bidders must hold a valid State of Hawaii General Engineering “A” license at the time of bidding.

[View original listing](https://hiepro.ehawaii.gov/public-display-solicitation.html?rfid=27000492&resetCookie)