Opportunity
Baldwin Park Planet bids #146879
Ana Montenegro Park construction and park improvements
Posted
October 02, 2026
Respond By
October 27, 2026
Identifier
146879
NAICS
236220, 238990, 238210, 238220, 238910, 561730
The City of Baldwin Park is seeking a contractor to build Ana Montenegro Park, including new play, restroom, landscape, irrigation, lighting, and stormwater improvements. - Government buyer: City of Baldwin Park, Public Works Department, Engineering Division. - Project: Ana Montenegro Park construction at Joanbridge Street and Maine Avenue, Baldwin Park, California. - Scope: Park construction and renovation, including a restroom building, playground equipment and resilient rubber surfacing, shade structures, paving, walls, fencing and gates, seating, park signs, landscaping, irrigation, lighting, utilities, drainage, and a walking trail. The plans also call for accessible routes and restroom features, erosion and stormwater controls, and a smart irrigation controller with weather adjustment. - Named manufacturers and product vendors: NDS, Jensen, Malibu Ceramic Works, Totturf, QCP Corp., Southwest Boulder and Stone, Saris Infrastructure, Bravo Sign & Design, Inc., Dave Bang Associates, Calsense, Rain Bird, and Ligman. The geotechnical report names Terracon as its preparer and CWE Corp as its client. Some specified products allow an approved equal. - Notable specified products: Calsense CS3000 irrigation controller; Rain Bird flow sensor and XFS-CV-06-12 dripline; Ligman UHAM-20001-SO-40-T4-8030 solar luminaire; Totturf TPV Supreme play surface or approved equal; QCP Corp. park furnishings; and Saris Infrastructure bike repair equipment or approved equal. - Key quantities: 890 units of imported material/earthwork; 3,400 of resilient rubber play surface; 1 turnkey play-equipment structure; 1 restroom building; 2 18-by-18-foot butterfly shades (including installation of one City-purchased shade) and 2 20-by-20-foot butterfly shades; 2 cantilevered shade canopies; and scheduled trees, shrubs, and succulents detailed below. - Construction requirements: 60 working days, with an allowance to pause working days for long-lead procurement when no other work can proceed; 90-day maintenance; ADA accessibility; California prevailing-wage and contractor-registration compliance; and $3,000 per working day in liquidated damages for late completion. The camera scope is conduit only; cameras, data connection, and control panel are by others. - Geotechnical attachment: Terracon’s report for CWE Corp. addresses subsurface exploration, earthwork, foundations, floor slabs, seismic conditions, and stormwater infiltration for a proposed mini-park. It does not add separately quantified products to the park construction bill of quantities.
Description
The City of Baldwin Park is seeking bids for construction of Ana Montenegro Park. The work includes a restroom building, grading and importing approximately 890 cubic yards of soil, concrete flatwork, retaining walls and curbs, shade structures, playground equipment and rubberized play surface. Other work includes a monument sign, cloud-based surveillance system, hydration fountain, seat walls, LED lighting, perimeter fencing, drought-tolerant landscaping, water quality basins, and storm drain facilities. The bid response format is paper, and the stated duration is 60 working days.