# Baldwin Park Planet bids #146879

Ana Montenegro Park construction and park improvements

**Posted:** October 02, 2026
**Respond By:** October 27, 2026
**Identifier:** 146879
**NAICS:** 236220, 238990, 238210, 238220, 238910, 561730

The City of Baldwin Park is seeking a contractor to build Ana Montenegro Park, including new play, restroom, landscape, irrigation, lighting, and stormwater improvements.
- **Government buyer:** City of Baldwin Park, Public Works Department, Engineering Division.
- **Project:** Ana Montenegro Park construction at Joanbridge Street and Maine Avenue, Baldwin Park, California.
- **Scope:** Park construction and renovation, including a restroom building, playground equipment and resilient rubber surfacing, shade structures, paving, walls, fencing and gates, seating, park signs, landscaping, irrigation, lighting, utilities, drainage, and a walking trail. The plans also call for accessible routes and restroom features, erosion and stormwater controls, and a smart irrigation controller with weather adjustment.
- **Named manufacturers and product vendors:** **NDS**, **Jensen**, **Malibu Ceramic Works**, **Totturf**, **QCP Corp.**, **Southwest Boulder and Stone**, **Saris Infrastructure**, **Bravo Sign & Design, Inc.**, **Dave Bang Associates**, **Calsense**, **Rain Bird**, and **Ligman**. The geotechnical report names **Terracon** as its preparer and **CWE Corp** as its client. Some specified products allow an approved equal.
- **Notable specified products:** Calsense CS3000 irrigation controller; Rain Bird flow sensor and XFS-CV-06-12 dripline; Ligman UHAM-20001-SO-40-T4-8030 solar luminaire; Totturf TPV Supreme play surface or approved equal; QCP Corp. park furnishings; and Saris Infrastructure bike repair equipment or approved equal.
- **Key quantities:** 890 units of imported material/earthwork; 3,400 of resilient rubber play surface; 1 turnkey play-equipment structure; 1 restroom building; 2 18-by-18-foot butterfly shades (including installation of one City-purchased shade) and 2 20-by-20-foot butterfly shades; 2 cantilevered shade canopies; and scheduled trees, shrubs, and succulents detailed below.
- **Construction requirements:** 60 working days, with an allowance to pause working days for long-lead procurement when no other work can proceed; 90-day maintenance; ADA accessibility; California prevailing-wage and contractor-registration compliance; and $3,000 per working day in liquidated damages for late completion. The camera scope is conduit only; cameras, data connection, and control panel are by others.
- **Geotechnical attachment:** Terracon’s report for CWE Corp. addresses subsurface exploration, earthwork, foundations, floor slabs, seismic conditions, and stormwater infiltration for a proposed mini-park. It does not add separately quantified products to the park construction bill of quantities.

### Description

The City of Baldwin Park is seeking bids for construction of Ana Montenegro Park. The work includes a restroom building, grading and importing approximately 890 cubic yards of soil, concrete flatwork, retaining walls and curbs, shade structures, playground equipment and rubberized play surface. Other work includes a monument sign, cloud-based surveillance system, hydration fountain, seat walls, LED lighting, perimeter fencing, drought-tolerant landscaping, water quality basins, and storm drain facilities. The bid response format is paper, and the stated duration is 60 working days.

[View original listing](https://vendors.planetbids.com/portal/55389/bo/bo-detail/146879)
