Opportunity

North Carolina eVP #274-SM 2021-0027

Camp Pond Dam Reconstruction Project for the City of Raleigh

Posted

September 22, 2026

Respond By

November 05, 2026

Identifier

274-SM 2021-0027

NAICS

237110, 237990, 238110

This opportunity involves the Camp Pond Dam Reconstruction Project for the City of Raleigh's Stormwater Service Unit. - Government Buyer: - City of Raleigh, Stormwater Service Unit - Products and Services Requested: - Removal of corrugated metal pipe portion of existing primary spillway - Grouting and sealing of upstream portion - Demolition and removal of existing riser - Installation of cured-in-place pipe for reinforced concrete pipe portion of spillway - Replacement of auxiliary weir with a new 75-foot weir - Construction of headwall downstream of new pipe - Placement of riprap and grouted riprap for grade and embankment stabilization - Placement of quarry stones in Richland Creek - OEMs and Vendors: - No specific OEMs or vendors are mentioned in the solicitation - Unique or Notable Requirements: - Sealed bids required; electronic bids not permitted - Mandatory pre-bid meeting attendance - Prequalification required for bidders - Bidders must be licensed in North Carolina and provide bid security - Bid documents available only through Duncan Parnell's bid room; registration required for addenda - Technical Details: - Project focuses on stormwater infrastructure improvements and dam safety - Includes both demolition and new construction elements - Emphasis on stabilization and environmental protection measures

Description

The project involves the reconstruction of Camp Pond Dam, including removing the corrugated metal pipe portion of the existing primary spillway, grouting and sealing off the upstream portion, demolishing and removing the existing riser, and installing cured-in-place pipe for stormwater conveyance. It also includes removing the existing auxiliary weir and replacing it with a 75-foot weir, constructing a headwall downstream of the cured-in-place pipe, placing riprap and grouted riprap to tie in downstream grades and side embankments on the downstream slope of the dam towards Richland Creek, and placing quarry stones in Richland Creek. Bids must be submitted in sealed form and electronic bids are not permitted.

View original listing