# North Carolina eVP #274-SM 2021-0027

Camp Pond Dam Reconstruction Project for the City of Raleigh

**Posted:** September 22, 2026
**Respond By:** November 05, 2026
**Identifier:** 274-SM 2021-0027
**NAICS:** 237110, 237990, 238110

This opportunity involves the reconstruction of Camp Pond Dam for the City of Raleigh's Stormwater Service Unit.
- Government Buyer: City of Raleigh, Stormwater Service Unit
- Scope includes:
  - Removal of the corrugated metal pipe portion of the existing primary spillway
  - Grouting and sealing the upstream portion
  - Demolition and removal of the existing riser
  - Installation of a cured-in-place pipe for the reinforced concrete pipe portion of the primary spillway (stormwater conveyance from Richland Drive catch basins)
  - Replacement of the auxiliary weir with a new 75-foot weir
  - Construction of a headwall downstream of the new pipe
  - Placement of riprap and grouted riprap to stabilize downstream grades and embankments
  - Placement of quarry stones in Richland Creek
- No specific OEMs or vendors are named in the solicitation
- Notable requirements:
  - Sealed bids only (electronic bids not accepted)
  - Mandatory pre-bid meeting attendance
  - Prequalification required for bidders
  - Bidders must be licensed in North Carolina and provide bid security
  - Bid documents available through Duncan Parnell's bid room; only registered bidders receive addenda

### Description

The project involves removing the corrugated metal pipe portion of the existing primary spillway, grouting and sealing off the upstream portion, and demolishing the existing riser. It includes installing a cured-in-place pipe for the reinforced concrete pipe portion of the primary spillway to convey stormwater from catch basins on Richland Drive. The project also entails removing the existing auxiliary weir and replacing it with a 75-foot weir, constructing a headwall downstream of the cured-in-place pipe, placing riprap and grouted riprap to tie in downstream grades and side embankments on the downstream slope of Camp Pond Dam towards Richland Creek, and placing quarry stones in Richland Creek.

[View original listing](https://evp.nc.gov/solicitations//details/?id=f391ff7e-c5b6-f111-aaac-001dd80d92a5)