Opportunity

PIEE #W9128F26RA075

Fuel System Repairs and Upgrades for F-24 Tanks at Concord, NH

Buyer

USACE Northwestern Division Endist Omaha

Posted

September 21, 2026

Respond By

October 06, 2026

Identifier

W9128F26RA075

NAICS

237990, 237120

The U.S. Army Corps of Engineers, Omaha District, is soliciting contractors for a comprehensive fuel system repair and upgrade project at Concord, NH, focused on two F-24 fuel storage tanks. - Government Buyer: - U.S. Army Corps of Engineers, Omaha District (W071 ENDIST OMAHA) - Scope of Work: - Replacement of grounding and high-level shut-off valves for both F-24 tanks - Extension of the tank catwalk platform - Installation of a check valve on the relief discharge into Tank 2 - Addition of a truck offload meter and visual fuel flow indicator - Installation of an eyewash station and filter separator maintenance platform at the truck offload/fillstand - Integrated truck overfill prevention and ground verification systems - Installation of protective pipe bollards for the offload/fillstand - Replacement of the equipment shelter ground system - Ground verification system for offload operations - Supply, installation, and testing of an Automatic Tank Gauging (ATG) system for both tanks - Products/Services Requested: - No specific OEMs, brands, or part numbers are mentioned - All items are facility upgrades, safety systems, and instrumentation for fuel storage and handling - Unique Requirements: - Integrated safety and verification systems for truck offload operations - Automatic Tank Gauging system installation and testing - Emphasis on facility safety, operational reliability, and compliance - No named OEMs or vendors in the solicitation.

Description

****This is a pre solicitation notice only and includes a draft Scope of Work.This project includes replacing the grounding and high-level shut-off valves for both F-24 tanks (Tank 1 and Tank 2), extending the tank catwalk platform, and installing a check valve on the relief discharge into Tank 2. Additionally, the scope involves installing a truck offload meter, a visual fuel flow indicator, an eyewash station, and a filter separator maintenance platform for the truck offload/fillstand, while providing integrated truck overfill prevention and ground verification systems. To complete the facility upgrades, the project also incorporates all necessary work to install protective pipe bollards for the offload/fillstand, replace the equipment shelter ground system, provide a ground verification system for offload operations, and execute the complete supply, installation, and testing of the Automatic Tank Gauging (ATG) system on fuel storage tanks 1 and 2.

View original listing