# PIEE #W9128F26RA075

Fuel System Repairs and Upgrades for F-24 Tanks at Concord, NH

**Buyer:** USACE Northwestern Division Endist Omaha
**Posted:** September 21, 2026
**Respond By:** October 06, 2026
**Identifier:** W9128F26RA075
**NAICS:** 237990, 237120

The U.S. Army Corps of Engineers, Omaha District, is soliciting contractors for a comprehensive fuel system repair and upgrade project at Concord, NH, focused on two F-24 fuel storage tanks.
- Government Buyer:
  - U.S. Army Corps of Engineers, Omaha District (W071 ENDIST OMAHA)
- Scope of Work:
  - Replacement of grounding and high-level shut-off valves for both F-24 tanks
  - Extension of the tank catwalk platform
  - Installation of a check valve on the relief discharge into Tank 2
  - Addition of a truck offload meter and visual fuel flow indicator
  - Installation of an eyewash station and filter separator maintenance platform at the truck offload/fillstand
  - Integrated truck overfill prevention and ground verification systems
  - Installation of protective pipe bollards for the offload/fillstand
  - Replacement of the equipment shelter ground system
  - Ground verification system for offload operations
  - Supply, installation, and testing of an Automatic Tank Gauging (ATG) system for both tanks
- Products/Services Requested:
  - No specific OEMs, brands, or part numbers are mentioned
  - All items are facility upgrades, safety systems, and instrumentation for fuel storage and handling
- Unique Requirements:
  - Integrated safety and verification systems for truck offload operations
  - Automatic Tank Gauging system installation and testing
  - Emphasis on facility safety, operational reliability, and compliance
- No named OEMs or vendors in the solicitation.

### Description

****This is a pre solicitation notice only and includes a draft Scope of Work.This project includes replacing the grounding and high-level shut-off valves for both F-24 tanks (Tank 1 and Tank 2), extending the tank catwalk platform, and installing a check valve on the relief discharge into Tank 2. Additionally, the scope involves installing a truck offload meter, a visual fuel flow indicator, an eyewash station, and a filter separator maintenance platform for the truck offload/fillstand, while providing integrated truck overfill prevention and ground verification systems. To complete the facility upgrades, the project also incorporates all necessary work to install protective pipe bollards for the offload/fillstand, replace the equipment shelter ground system, provide a ground verification system for offload operations, and execute the complete supply, installation, and testing of the Automatic Tank Gauging (ATG) system on fuel storage tanks 1 and 2.