Opportunity
Town of Flower Mound Ionwave #2026-128-B Addendum 2
Forest Vista AC Water Line Decommissioning Project – Water Meter Boxes, Pipe Decommissioning, and Service Installation
Posted
September 01, 2026
Respond By
October 13, 2026
Identifier
2026-128-B Addendum 2
NAICS
237110
This opportunity involves the Town of Flower Mound, Texas seeking bids for the Forest Vista AC Water Line Decommissioning project. - Government Buyer: - Town of Flower Mound, Purchasing Office - Project Scope: - Decommissioning approximately 1,500 linear feet of 6-inch asbestos cement (AC) water pipe - Relocation of water meters to the right-of-way (ROW) line - Installation of new service pipes to each customer as specified in project plans - Site preparation, erosion and sediment control, traffic control, and restoration - Products Requested: - Water meter boxes and related components by DFW Plastics, Inc. (OEM) - Part numbers: DFW37C, DFW37F-12, DFW65C-SBSMTR-LID, DFW65C-12-SBSMTR, DFW65C-12-BODY ONLY, DFW37F-12-BODY, DFW37C-1-LID - Domestic water meter boxes (4 units) - 1-inch water meters (3 units) - Gate valves (2-inch: 2 units; 12-inch: 1 unit) - Topsoil (320 units), block sod (320 units) - Bullhead (dual-branch) service connections (2 units) - Private and public water services (1-inch, 1.5-inch, 2-inch) - Services Requested: - Decommissioning of AC water pipe - Relocation of water meters - Installation of service pipes - Mobilization, traffic control, site preparation, erosion control, signage, valve removal, and plugging existing water mains - Unique/Notable Requirements: - Bid bond of at least 5% of total bid - Compliance with Town of Flower Mound standards and North Central Texas Council of Governments specifications - Salvaged water valves and fire hydrants must be returned to the town - Water meter boxes must be replaced with new units per town standards - Prevailing wage rates, performance, payment, and maintenance bonds with a two-year warranty period - Strict adherence to utility protection, traffic control, and restoration standards - OEM Highlight: - DFW Plastics, Inc. specified for water meter boxes and components - Location: - Flower Mound, Denton County, Texas - Period of Performance: - Substantial completion within 45 days, final completion within 60 days from Notice to Proceed; two-year maintenance bond after final acceptance
Description
This solicitation is for the decommissioning of approximately 1,500 linear feet of existing 6-inch AC water pipe in Flower Mound, Texas. The project includes relocating meters to the right-of-way line and installing service pipes to each customer as detailed in the plans. Bidders must complete and submit all proposal pages P-1 through P-31. The bid due date has been extended to October 13, 2026, with a questions deadline of September 29, 2026.