# Town of Flower Mound Ionwave #2026-128-B Addendum 2

Forest Vista AC Water Line Decommissioning Project – Water Meter Boxes, Pipe Decommissioning, and Service Installation

**Posted:** September 01, 2026
**Respond By:** October 13, 2026
**Identifier:** 2026-128-B Addendum 2
**NAICS:** 237110

This opportunity involves the Town of Flower Mound, Texas seeking bids for the Forest Vista AC Water Line Decommissioning project.
- Government Buyer:
  - Town of Flower Mound, Purchasing Office
- Project Scope:
  - Decommissioning approximately 1,500 linear feet of 6-inch asbestos cement (AC) water pipe
  - Relocation of water meters to the right-of-way (ROW) line
  - Installation of new service pipes to each customer as specified in project plans
  - Site preparation, erosion and sediment control, traffic control, and restoration
- Products Requested:
  - Water meter boxes and related components by DFW Plastics, Inc. (OEM)
    - Part numbers: DFW37C, DFW37F-12, DFW65C-SBSMTR-LID, DFW65C-12-SBSMTR, DFW65C-12-BODY ONLY, DFW37F-12-BODY, DFW37C-1-LID
  - Domestic water meter boxes (4 units)
  - 1-inch water meters (3 units)
  - Gate valves (2-inch: 2 units; 12-inch: 1 unit)
  - Topsoil (320 units), block sod (320 units)
  - Bullhead (dual-branch) service connections (2 units)
  - Private and public water services (1-inch, 1.5-inch, 2-inch)
- Services Requested:
  - Decommissioning of AC water pipe
  - Relocation of water meters
  - Installation of service pipes
  - Mobilization, traffic control, site preparation, erosion control, signage, valve removal, and plugging existing water mains
- Unique/Notable Requirements:
  - Bid bond of at least 5% of total bid
  - Compliance with Town of Flower Mound standards and North Central Texas Council of Governments specifications
  - Salvaged water valves and fire hydrants must be returned to the town
  - Water meter boxes must be replaced with new units per town standards
  - Prevailing wage rates, performance, payment, and maintenance bonds with a two-year warranty period
  - Strict adherence to utility protection, traffic control, and restoration standards
- OEM Highlight:
  - DFW Plastics, Inc. specified for water meter boxes and components
- Location:
  - Flower Mound, Denton County, Texas
- Period of Performance:
  - Substantial completion within 45 days, final completion within 60 days from Notice to Proceed; two-year maintenance bond after final acceptance

### Description

This solicitation is for the decommissioning of approximately 1,500 linear feet of existing 6-inch AC water pipe in Flower Mound, Texas. The project includes relocating meters to the right-of-way line and installing service pipes to each customer as detailed in the plans. Bidders must complete and submit all proposal pages P-1 through P-31. The bid due date has been extended to October 13, 2026, with a questions deadline of September 29, 2026.

[View original listing](https://flower-mound.ionwave.net/PublicDetail.aspx?bidID=845&SourceType=1)