Opportunity

Federal Register #2026-24099

FAA proposes inspection and replacement requirements for GE90 HPT rotor seals

Buyer

Federal Aviation Administration (Department of Transportation)

Posted

November 27, 2026

Respond By

January 12, 2027

Identifier

2026-24099

NAICS

336412

The Federal Aviation Administration proposes safety requirements for certain GE90 engines and their interstage HPT rotor seals. - Government buyer: U.S. Department of Transportation, Federal Aviation Administration (FAA), Aircraft Certification Service. - OEM: General Electric Company (GE), manufacturer of the affected GE90-110B1 and GE90-115B engines and seals. The proposal references GE GE90-100 Service Bulletin 72-0925 R00. - Affected seals: Interstage high-pressure turbine (HPT) rotor seals, with no purchase quantities specified: - Part number 1865M18P04 - Part number 2047M23P01 - Part number 2087M22P02 - Part number 2087M22P03 - Part number 2448M33P01 - Part number 2502M00P01 - Part number 2502M00P02 - Part number 2505M72P01 - Part number 2505M72P02 - Proposed requirements: Operators would calculate each affected seal’s service-life measures and population, then replace seals at applicable cycle limits or, for qualifying fast- and medium-population seals, conduct initial and repetitive ultrasonic inspections. Seals with nonserviceable crack indications must be removed. - The FAA estimates 339 engines are affected. The safety concern is seal-rim failure that could release high-energy debris and damage an engine or airplane. This is a proposed safety regulation, not a purchase solicitation.

Description

The FAA proposes an airworthiness directive for certain General Electric Company GE90-110B1 and GE90-115B engines. It would require operators to determine the recalculated service life of the interstage high-pressure turbine rotor seal and, depending on the results, replace the seal. For certain engine populations, initial and repetitive ultrasonic inspections for cracks may be performed as an alternative, with removal from service required based on inspection results. The proposal addresses a safety concern following an aborted takeoff caused by failure and liberation of the seal rim; comments are due January 11, 2027.

View original listing