Opportunity

SBIR / STTR #A224-024

Phase I research and design for a reconfigurable UH-60 structural armor floor

Buyer

Army SBIR

Posted

August 22, 2022

Respond By

September 27, 2022

Identifier

A224-024

NAICS

541715, 541330

The Army SBIR opportunity centers on Phase I design research for a lightweight, reconfigurable UH-60 structural armor floor. - Government buyer: U.S. Army SBIR; attached material also identifies the Army Aviation and Missile Command’s Apache Longbow Program Office, Survivability/Lethality Analysis Directorate, and the Joint Electronic Advanced Technology Project Office under the Department of Defense, Assistant Secretary of Defense for Research and Engineering, NAWCWD. - Core request: Develop a replacement UH-60 floor and Medical Interior Unit concept that supports flexible mission configurations, seat-track loads, armor, and mission equipment while preserving airframe strength, floor function, and cabin space. - Potential materials: Para-aramid structural/ballistic materials, next-generation UHMWPE/polyolefin composites, and boron-carbide ceramics, including 3D-printed ceramics. - Phase I deliverables and funding: Conceptual design or model, optional armor concept, structural/vibration/impact test plan, and report. Up to six months; funding up to $250,000. - Additional attachment items: Materials also describe AH-64D Apache Longbow procurement and survivability testing, plus aircraft survivability equipment testing. These items are listed separately below because the attachment summaries do not align with the core UH-60 floor opportunity. - OEMs/vendors: No specific OEM, manufacturer, or vendor is named as a prospective supplier.

Description

The Army SBIR Phase I topic seeks development of a lightweight, reconfigurable structural armor floor system for the UH-60 fleet. The floor is intended to replace the OEM floor and Medical Interior Unit while supporting seat-track hardware, ballistic armor, and mission equipment without compromising airframe strength, floor function, or cabin volume. Phase I deliverables include a conceptual design or model, optional armor, a structural, vibrational, and impact-load test plan, and a report. The stated funding amount is up to $250,000, and the phase duration is up to six months.

View original listing