Opportunity
Saskatchewan Tenders #HWY-H26110
Highway 51 surfacing and culvert construction over 25 km in Saskatchewan
Posted
November 25, 2026
Respond By
December 10, 2026
Identifier
HWY-H26110
NAICS
237310
The Saskatchewan Ministry of Highways is seeking a contractor for a 25 km Highway 51 surfacing project in Saskatchewan. - Government buyer: Saskatchewan Ministry of Highways; the tender identifies Kaylea Rogers. The initial release also names the Ministry of SaskBuilds and Procurement and the Government of Saskatchewan. - Project: Contract H26110, Control Section 51-01, from the junction with Highway 4 westward for 25.0 km. - Estimated quantities: 157,000 tonnes of sub-base course, 114,500 tonnes of granular base course, and 45,500 tonnes of asphalt concrete (EPS), all placed in the roadway. - Additional item: One smooth-wall steel culvert, 750 mm inner diameter by 56.0 m long, with a minimum wall thickness of 12.5 mm and ASTM A252 Grade 2 or higher; installation includes tunnelling or boring and open cut. - Work and requirements: Road preparation, aggregate and asphalt surfacing, culvert and sign work, traffic accommodation, seeding, and environmental controls. The project includes protection of wetlands and watercourses, sediment and erosion controls, spill prevention, and site restoration under an aquatic habitat permit. - Phasing: Phase I covers aggregate processing, hauling and interim stockpiling of traffic gravel, and through-grade culverts. Phase II includes the remaining work, with substantial completion followed by final completion. - OEMs and vendors: No product manufacturers, OEMs, or commercial vendors are named. The Water Security Agency is identified in connection with the aquatic habitat permit.
Description
Construction of a surfacing structure on Highway No. 51 from the junction of Highway No. 4 to 25.0 km west, for a total distance of 25.0 km. Estimated quantities include 157,000 tonnes of sub-base course, 114,500 tonnes of granular base course, and 45,500 tonnes of asphalt concrete. Phase I is to be completed by March 15, 2027, and Phase II by November 30, 2027. A tender deposit of 5% of the total bid is required.