Opportunity

Burbank Planet bids #RFP / BS 1554

Design-build solar PV installations and related equipment for Burbank Water and Power

Posted

November 25, 2026

Respond By

December 29, 2026

Identifier

RFP / BS 1554

NAICS

238210, 236220

The City of Burbank is seeking a design-build contractor for a multi-site solar PV project serving Burbank Water and Power. - Buyer: City of Burbank Purchasing Division, for Burbank Water and Power (BWP). - Scope: Design and build rooftop solar at three buildings and solar canopies at two truck-parking structures at the EcoCampus. The project calls for at least 700 kW DC and 600 kW AC, with front-of-the-meter interconnection to BWP’s 12 kV distribution system. - Major equipment: 368 435 Wp panels; 765 575 Wp panels; 12 string inverters (3 at 36 kW, 5 at 50 kW, and 4 at 60 kW); panelboards, switchboards, monitoring and control equipment, a meteorological station, communications and protection equipment, UPS, and panel-washing equipment. - Named OEMs: SEL (Schweitzer Engineering Laboratories), Cisco, and Tucker. Specified equipment includes SEL automation, GPS clock, annunciator, meter, and protection relay equipment; a Cisco 2520 managed switch; and Tucker panel-cleaning equipment. PV panel and inverter manufacturers are not specified; equivalent products may be proposed where allowed. - Services and requirements: Engineering, procurement, construction, installation, permitting, testing, commissioning, training, and closeout. Requirements include applicable IRA tax-credit and FEOC compliance, prevailing-wage and apprenticeship requirements, and coordination with BWP. Domestic-content documentation is requested and domestic-content compliance is separately scored. - Optional service: Five years of solar operations and maintenance (O&M). - Prospective bidders named: Addy Electric, Inc.; Allied Solutions; CABD Construction Inc.; Current Energy, LLC; Excite Energy; Floral Park Consulting LLC; ForeFront Power; Glumac; Hathaway Dinwiddie Construction Company; Kana Subsurface Engineering; Maranatha Revenue Group; SEC LLC; SitelogIQ Inc.; Staten Solar; Struere; Terravanta Inc.; and Thomas Swift. - Schedule: Target start is early 2027, with completion and system energization targeted by the end of 2027.

Description

The City of Burbank is seeking a qualified general contractor to build solar photovoltaic generation at selected Burbank Water and Power buildings and structures, including balance-of-system components needed to export power to the distribution circuit. The project includes three rooftop and two truck-canopy solar PV installations, estimated at 700 kW DC total. The systems will be interconnected front of the meter and deliver energy to BWP’s 12 kV feeder distribution system. The solicitation requires a C-10 Electrical Contractor license and includes bid, payment, and performance bond requirements.

View original listing