Opportunity

Wichita Bonfire #260304

Wichita localized pavement repairs and Poplar Street reconstruction

Posted

November 25, 2026

Respond By

December 11, 2026

Identifier

260304

NAICS

237310

The City of Wichita is seeking construction bids for localized pavement preservation and street repairs at multiple Wichita locations. - Government buyer: City of Wichita, Public Works & Utilities Department; purchasing through the City Purchasing Manager, with project questions directed to the City Engineer’s Office. - Project: 2026 Outsourced Pavement Preservation Program, CIP Localized Street Repairs; Project 472-2026-086271, Solicitation 260304. - OEM/vendor mentioned: Crafco is named in attached crack-sealing instructions, which refer to RoadSaver, PolyFlex, Parking Lot, and asphalt-rubber products and recommend Crafco melters. These are instructional references, not separately listed purchases. - Requested work: Concrete pavement and base repairs; curb and gutter, driveway, valley gutter, sidewalk, and wheelchair-ramp repairs; partial-depth asphalt repairs and crack sealing; crushed-rock base; traffic control and mobilization; message boards; and Poplar Street pavement removal and reconstruction, grading, excavation, and restoration. - Bid-table quantities: 950 units of 8-inch reinforced concrete pavement repair; 100 combined curb and gutter; 125 units of 8-inch reinforced concrete base repair; 45 units of partial-depth asphalt repair (BM-2, PG 64-22); 10 units of crushed rock base; and 35 message-board days. Poplar Street items include 130 units of pavement removal, 240 units each of 6-inch asphalt pavement with 4-inch bituminous base and 5-inch reinforced crushed-rock base, 120 units of excavation, and one lump-sum item each for traffic control, mobilization, grading, and site restoration. - Locations: Seven listed arterial repair sites span Districts 1–3: E Central Avenue; three sections of S Rock Road; and three sections of E Harry Street. Attachment estimates include concrete repairs, base-concrete repairs, and partial-depth asphalt repairs; actual repair locations and quantities may change based on field marking. - Notable requirements: Poplar Street work must begin before work at other locations. The work order is to be issued within 30 calendar days after award, and work must be completed within 60 working days after it begins. Specifications also address concrete mixes and reinforcement, maintaining traffic access, notifying property owners, repair timelines, restoration, seeding, and erosion control. A 5% bid bond or annual bid bond is required, along with performance and labor/material payment bonds for the successful bidder.

Description

The City of Wichita is seeking bids for construction services for its 2026 Outsourced Pavement Preservation Program, involving localized street repairs at various locations. Work includes pavement, curb and gutter, base, and asphalt repairs, as well as traffic control, mobilization, grading, excavation, and site restoration. The project includes repairs at specified Wichita street locations and Poplar Street work must begin before other locations. Work is to be completed within 60 working days from the start of work; a bid bond of 5% of the total bid or an annual bid bond is required.

View original listing