Opportunity

Sound Transit Biddingo #RTA/RP 0182-26

Sound Transit BRT and transit-facility signage fabrication and installation

Posted

November 25, 2026

Respond By

January 07, 2027

Identifier

RTA/RP 0182-26

NAICS

238990

Sound Transit is seeking a contractor to fabricate, supply, deliver, and install passenger and facility signage across its Stride Bus Rapid Transit network and other transit facilities. - Buyer: Central Puget Sound Regional Transit Authority (Sound Transit); related Bellevue Transit Center work references King County Metro and its Rail Division. - Scope: Signage for Stride S1, S2, and S3, plus signage specifications covering Sounder, Link, and ST Express facilities. Work includes new signs, replacements, refacing, mounting hardware, fabrication, delivery, storage, installation, site coordination, and permitting. - OEMs and named companies: Hilti (HIT-HY 200 anchoring system) and Loctite (242 thread-locking compound) are specified products. Drawing credits or attributions name Two Twelve Harakawa Inc., Maestri Design Inc., Jon Bentz Design, Mayer/Reed, and Dimensional Innovations (DI); these are not identified as required bidders or sign OEMs. Feng Han prepared structural calculations. King County Metro furnishes KCM RTIS equipment and an enclosure for contractor installation; their equipment manufacturer is not identified. - Sign schedules include numerous types, including station IDs, platform and customer-information signs, pedestrian and vehicle directionals, bus-bay and paratransit signs, tactile and regulatory signs, ORCA reader decals, and facility signs. Example scheduled quantities include 194 F3 tactile signs, 260 R7 ORCA reader decals, 122 C6 customer-information signs, and 65 E1 bus-bay signs. The pricing schedule also includes replacement/refacing items and provisional allowances. - Notable requirements: Follow Sound Transit signage manuals, specifications, artwork, schedules, and mounting details; provide materials, equipment, labor, and required permits. Tactile signage and accessibility requirements apply. Structural calculations specify steel supports, anchors, stainless-steel bolts, and Hilti adhesive anchors; sign framing is excluded from the cited calculations. - Work near Link Light Rail right-of-way or the Downtown Seattle Transit Tunnel must follow King County Metro/Sound Transit track-access procedures, including approved access planning and safety coordination. Bellevue Transit Center drawing details include shelter modifications, sign mounting, and contractor installation of Metro-furnished RTIS equipment. - The contract continues through final acceptance; no fixed contract duration or option years are specified.

Description

Sound Transit is requesting proposals for fabrication and installation of transit signage in its Bus Rapid Transit (BRT) system. The full scope of work is provided in Exhibit C, and the solicitation also includes associated design and mounting documents. The contract will run from execution until final acceptance of the work by Sound Transit. Proposals are due January 6, 2027, and a non-mandatory pre-proposal meeting is scheduled for December 15, 2026.

View original listing