Opportunity

Utah Public Procurement Place U3P #CR27030

SUU America First Event Center air-handler, fan, pump, and controls upgrade

Posted

November 25, 2026

Respond By

December 21, 2026

Identifier

CR27030

NAICS

238220, 334512

Utah DFCM is seeking mechanical construction services to upgrade air handling and related systems at Southern Utah University’s America First Event Center. - Buyer and project - State of Utah, Division of Facilities Construction and Management (DFCM); project site is Southern Utah University (SUU), Cedar City. - Project designer: WHW Engineering. VBFA Controls is identified as controls installer. - Estimated construction cost: $1,274,789. - Requested work - Remove and replace AHU-7 and AHU-8, associated components, and controls; add or replace roof-mounted relief fans and related pumps and mechanical/electrical work. - Rebalance associated VAVs, grilles, and diffusers, and provide testing and balancing. - Upgrade pneumatic controls to Honeywell ComfortPoint DDC, integrate with the campus Honeywell network and head end, and provide 48 hours of operator training during the first-year warranty period. - Named manufacturers and equipment - Scott Springfield Mfg.: one AHU-7 (16,100 CFM) and one AHU-8 (26,800 CFM); specified filtration, cooling coils, smoke detection, controls integration, and spring isolation requirements apply. - Greenheck: six relief fans—three CUE-200-VG, one CUBE-300, one CUBE-360, and one GB-420—with new curbs and variable-frequency drives (VFDs). - B&G: two e-90 chilled-water coil pumps, one for each air handler. - Honeywell is the specified controls basis of design. No AHU or pump part numbers are stated beyond the models listed above. - Notable site and safety requirements - Coordinate work in an occupied university facility, roof alterations, equipment access, and the roofing contractor’s warranty requirements. - Provide seismic submittals and obtain approval before applicable mechanical work begins. - A licensed abatement contractor must remove identified asbestos-containing materials before disturbance. The survey found over 350 square feet of pin adhesive containing 7% chrysotile and about 25 square feet of pipe-thread sealant with less than 0.25% tremolite/actinolite. - Remove and dispose of 14 fluorescent bulbs, 2 air-handler control modules, 7 PCB ballasts, and 4 thermostats before demolition. Lead was detected on blue metal drainpipes. - Procurement services and requirements - Mechanical construction, equipment installation, controls commissioning, testing and balancing, seismic engineering submittals, and roof modifications. - Utah DFCM subcontractor-list documentation requirements apply; bidders may document a special exception when qualified subcontractor bids are unavailable.

Description

The State of Utah Division of Facilities Construction and Management is seeking bids from Stage II prequalified mechanical contractors for construction services at Southern Utah University’s America First Events Center in Cedar City. Work includes removing and replacing air handlers #7 and #8 and associated items, and re-balancing the associated existing VAVs, supply grilles, and diffusers. Only contractors qualified through Stage I and listed on the applicable DFCM prequalified contractors list may bid; attendance at the mandatory meeting is also required for prime contractors. The stated construction cost estimate is $1,274,789.

View original listing