Opportunity
SAM #AFQ-2027-00113
Design, Build, and Commission a Pilot-Scale Cement Kiln System
Buyer
Alliance for Sustainable Energy
Posted
November 25, 2026
Respond By
January 26, 2027
Identifier
AFQ-2027-00113
NAICS
333248
The U.S. Department of Energy, through Alliance for Energy Innovation, LLC, which manages and operates the National Laboratory of the Rockies (NLR), seeks a subcontractor for a pilot-scale cement clinker production system. - Buyer and location - U.S. Department of Energy; National Laboratory of the Rockies (NLR), managed and operated by Alliance for Energy Innovation, LLC. - Delivery, installation, and commissioning at NLR’s Flatirons Campus. - OEMs and vendors - No equipment OEMs, manufacturers, subcontractor, or commercial product vendors are identified by name. No part numbers are provided. - Named organizations: U.S. Department of Energy, National Laboratory of the Rockies (NLR), and Alliance for Energy Innovation, LLC. - Requested system and equipment - One integrated pilot cement kiln system, with rotary kiln, feed equipment, controls and monitoring, clinker cooling, grinding, and emissions controls. Individual component quantities are not specified except where noted in the line items. - Natural-gas-fired rotary kiln: 15–24-inch inside diameter, 15–30 feet long, adjustable slope and speed, operating up to 1,600°C and designed for clinker production up to 100 kg/hr; stable production turndown to 25 kg/hr. Burner mounting must allow future hydrogen or direct-plasma burners. - Feed system: hopper and variable-speed gravimetric screw feeder, with specified feed capacity up to at least 170 kg/hr, feed monitoring, and dust-system venting. - Controls and monitoring: industrial PLC, touchscreen HMI, instrumentation, data logging, thermal camera, and separate visible-light camera. Control source code must be unlocked; the thermal camera must provide raw radiometric data without recurring license fees. - Clinker cooler: air-cooled, designed for up to 100 kg/hr and clinker discharge at no more than 100°C. - Grinding: ball mill system for raw materials and finished clinker, with an air classifier for the raw-material circuit; an additive feeder is also required for finish grinding. - Environmental controls: gas conditioning, cyclone, pulse-jet baghouse, natural-gas-fired afterburner, induced-draft fan, and stack. Specified limits include baghouse outlet particulate of 0.005 gr/dscf and at least 98% destruction of CO and VOCs by the afterburner. - Notable requirements and services - Design, integration, fabrication/procurement, delivery, installation, commissioning, and demonstration, including factory acceptance testing and site acceptance testing. - Design reviews, bills of materials, operating and maintenance documentation, safety and utility information, operator training of at least 16 hours, and a spare-parts list. - Warranty for parts and labor for at least 12 months after NLR acceptance. - Relative schedule after award: kickoff within 30 days; design and bill-of-materials milestones through week 24; factory acceptance by week 46; delivery by week 52; commissioning by week 58. - Commercial and performance information - No contract value is provided. The sample subcontract indicates a firm-fixed-price structure, but the listed payment amounts are zero and do not establish an actual price. - Performance begins upon execution; no total duration is stated. The subcontract may be extended by mutual written agreement. This is not described as an annual subscription.
Description
The objective of this work effort is to have a Subcontractor design and build a pilot-scale cement kiln system. The system includes the associated feed, cooling, grinding, and environmental control components. The kiln will be a horizontal rotating shaft heated using natural gas, with drive motors, blowers, and coolers powered by on-site AC power.